Facility |
Annual Emergency Stop Inspection not completed or inspection report not available. - Emergency shut off switch needs annual testing performed. OSFM form shall be kept on site. |
Facility |
Facility Operation and Maintenance Plan not completed or available. - Operations and Maintenance Template needs to be updated and kept on site |
Facility |
Missing copies of Annual Walkthrough Inspection Report. - Annual walkthrough needs to be performed. OSFM form shall be completed and kept on site. |
Facility |
Missing copy of emergency instructions or emergency procedures plan - Emergency Procedures Plan needs to be updated and kept on site. |
1, 2, 3 |
Piping interstitial must be open in all sumps - 175.420 b) Unless otherwise required by the manufacturer, the dispenser product piping sump jumper tubes shall be removed or the product piping test boots pulled back after testing to allow the interstice to be open to the sump sensors. This is for all sumps. |
1, 2, 3, 8 |
Shear valve inspection report not completed (Required during Annual Walkthrough Inspection). - Shear valves need annual testing performed. OSFM form shall be completed and kept on site. |
1, 2 |
Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry. - 175.405 a) 1) A) Spill containment equipment that will prevent release of product to
the environment when the transfer hose is detached from the fill
pipe (e.g., a spill catch basin). Spill containment equipment shall
be maintained in a dry, clean state. |