Notice of Violations (Current)
NOV Number:
E0020250461
(Pending)
Issue Date:
2/24/2025
Expiration Date:
4/25/2025
View NOV Form
Tanks |
Violation |
3 |
Install or replace lockable fill pipe caps. - Premium fill pipe cap is broken |
3 |
Line leak detection equipment in alarm or failed test, must repair or replace. - Annual Line Fail Alarm |
Facility |
Miscellaneous - Remove water from two Regular STP Sumps. |
1, 2, 3 |
Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry. |