5, 6, 7 |
Annual electronic line leak detector test not completed. - Annual electronic line leak detectors need annual testing. Passing results shall be entered on OSFM portal. |
5, 6, 7 |
Annual leak detection certification not completed (Required annually). - Annual ATG testing needs to be performed and passing results shall be entered on OSFM portal. |
Facility |
Financial responsibility must be reported yearly - Section 176.220 Proof of Financial Responsibility
a) Proof of financial responsibility for Section 176.215(a), (b), (c), (d) or (e) shall be
maintained on the respective OSFM forms, which may be complemented by
industry customs and practices so long as the OSFM form language is utilized.
The forms are available at https://sfm.illinois.gov/about/divisions/petroleumchemical-
safety/applications-and-forms.html |
5, 7 |
Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry. - 175.405 a) 1) A) Spill containment equipment that will prevent release of product to
the environment when the transfer hose is detached from the fill
pipe (e.g., a spill catch basin). Spill containment equipment shall
be maintained in a dry, clean state. |