Notice of Violatlions (Current)
NOV Number:
E0020252085
(Pending)
Issue Date:
8/4/2025
Expiration Date:
10/3/2025
View NOV Form
Tanks |
Violations |
8 |
Install or replace lockable fill pipe caps. - Replace broken fill pipe cap on Tank #8 Diesel. |
6, 7, 8 |
Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry. - 175.405 a) 1) A) Spill containment equipment that will prevent release of product to
the environment when the transfer hose is detached from the fill
pipe (e.g., a spill catch basin). Spill containment equipment shall
be maintained in a dry, clean state. |