Notice of Violatlions (Current)
NOV Number:
E0020251726
(Pending)
Issue Date:
7/9/2025
Expiration Date:
9/7/2025
View NOV Form
Tanks |
Violations |
3, 4, 5 |
Line leak detection equipment in alarm or failed test, must repair or replace. - Leak detector(s) failed annual testing. Per Tanknology test 6/25/2025 the DSL LDs would not catch simulated leaks - they are opening immediately to full operating pressure when leaks are simulated through our test apparatus. REPAIR/RETEST AND UPLOAD PASSING RESULTS. |