7 |
Line leak detection equipment in alarm or failed test, must repair or replace. - PLLD Shutdown Alarm and Gross Line Fail Alarm |
Facility |
Missing copies of 30 day Walkthrough Inspection Report. |
Facility |
Missing list of designated Class A/B & C Operators |
7, 8, 9 |
Precision line test required. |
7, 8, 9 |
Precision tank test required. - Monthly CSLDs were not provided. |
7, 8, 9 |
Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry. |
7, 9 |
Tank interstitial sensors in alarm or failed test, must repair or replace. - Low Liquid Alarm |