| 4, 5 |
Annual leak detection certification not completed (Required annually). - Annual leak detection certification (ATG) failed testing. Repair/replace as necessary. Retesting shall be completed and maintain passing test documentation on site. Failed on 5/18/2026 |
| 5 |
Install or replace lockable fill pipe caps. - Found Permium fill cap off and it will not snap back on the fill adaptor properly. Repair/Replace fill cap. (Low Profile cap) |
| 4, 5 |
Line interstitial sensors have been raised and rendered inoperational. - Dispenser 3/4 and Premium STP sensors are raised. |
| 4, 5 |
Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry. |
| 4, 5 |
Tank monitor does not appear to function properly and requires maintenance. - T1 Periodic test fail is in alarm. Repair/Replace to clear alarm. |
| 4, 5 |
Water in containment with required interstitial sensors - Remove water and repair containments to prevent water ingress. - Dispenser 3/4 and premium STP. Will need to see documentation showing containments have been fixed. |