Notice of Violations (Current)
NOV Number:
E0020261741
(Pending)
Issue Date:
7/8/2026
Expiration Date:
9/6/2026
View NOV Form
| Tanks |
Violations |
| 2 |
Line leak detection equipment in alarm or failed test, must repair or replace. - Leak detector(s) failed annual testing. Repair/replace as necessary. Repaired/replaced leak detector(s) shall be retested to show passing results. Per Tanknology test 6/16/2026 ;
"RUL 2 LD failed to stop the motor when put into pldd shutdown. Required manipulating the breakers to turn the motor on and off to catch the LD." |