Facility |
A/B operator retraining required as a result of issuance of the Notice of Violation - MIKE PATEL is the A/B holder for this facility. As the date of this NOV, he MUST retatke the A/B class. The certificate MUST have today's date or later. If not, the facility will be Red Tagged. |
1 |
Install or replace lockable fill pipe caps. - Fill cap must be replaced. Obvious crack. |
Facility |
Missing copies of 30 day Walkthrough Inspection Report. - Missing the most recent two month's |
Facility |
Missing copies of Annual Walkthrough Inspection Report. - Contact your contractor who completes your annual testing. |
1 |
Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry. |