Notice of Violations (Current)
NOV Number:
E0020250438
(Pending)
Issue Date:
2/20/2025
Expiration Date:
4/21/2025
View NOV Form
Tanks |
Violation |
3, 4 |
Precision tank test required. - A monthly Passing tank test is required for all tanks. |
1, 2, 3, 4 |
Tank monitor does not appear to function properly and requires maintenance. - The ATG is required to shown a tank test for every tank. Even if Titan Cloud is being used for the monthly print outs. |
NOV Number:
E0020250439
(Pending)
Issue Date:
2/21/2025
Expiration Date:
4/22/2025
View NOV Form
Tanks |
Violation |
6, 7, 8 |
Annual tank impressed current system test not completed. - 175.510 f)2)A)ii) Impressed current systems shall be tested annually as long
as testing results are -850 millivolts or a higher negative
number. In the event testing results do not meet the -850
millivolt requirement, the impressed current system shall be
repaired or upgraded as needed to meet the -850 millivolt
requirement. |
1, 2, 3, 4, 6, 7 |
Monthly impressed current log not available or maintained. - 175.510 f)4)c) Impressed current systems must be inspected every 30 days and
reports or a log maintained that shows date of inspection, initials of
inspector, hour, volt and amp readings, and power on verification.
A minimum of 2 years of records shall be kept on site.
Impressed Current Logs can be found at https://sfm.illinois.gov/ |