| 8 |
Annual line precision and mechanical line leak detector functional test not completed. - Equipment: Leak Detect - Piping - Mechanical Pressurized Line Leak Detection
Last tested 8/11/2025 |
| Facility |
Facility Operation and Maintenance Plan not completed or available. |
| Facility |
Farthest dispenser is greater than 40' and site lacks a communication system or system is inoperable |
| Facility |
Missing copies of 30 day Walkthrough Inspection Report. |
| Facility |
Missing copies of Annual Walkthrough Inspection Report. |
| Facility |
Missing copy of emergency instructions or emergency procedures plan |
| Facility |
Missing list of designated Class A/B & C Operators |
| 8 |
Precision line test required. - Equipment: Leak Detect - Piping - Mechanical Pressurized Line Leak Detection |
| 13, 14 |
Tank interstitial sensor functional test not accomplished (Required annually). - Equipment: Leak Detect - Tank - Non-Discriminating Interstitial Monitoring Sensors
Last test 8/11/2025 |
| 7, 12 |
Triennial spill prevention equipment testing not completed. - Equipment: Spill Contain Device - Single Wall Spill Bucket
Tank 7 last test was 6/19/2023
Tank 12 last test was 9/5/2019 |