8, 9, 10, 11, 12 |
Annual leak detection certification not completed (Required annually). - Annual leak detection certification (ATG) not completed. |
8, 9, 10, 11, 12 |
Annual line precision and mechanical line leak detector functional test not completed. - Annual third party testing required on all line leak detectors. |
8, 9, 11, 12 |
Overfill prevention equipment inspection(s) not completed (Required every 3 years). - Triennial inspection of overfill prevention device (overfill drop tube valve, overfill alarm, ball float valve) has not been completed. |
8, 9, 12 |
Spill prevention equipment failed triennial testing. Must be repaired or replaced. - Triennial inspection of spill bucket(s) has not been completed. |