| 5, 6, 7 |
Annual leak detection certification not completed (Required annually). |
| 7 |
Containment support components are cracked, deteriorated or missing. The cover and supporting components that are defective shall be replaced with factory manufactured components. - Spill bucket cover damged - repair or replace ; must be removable to allow for inspection |
| 6 |
Open electrical conduit or junction boxes. - ATG riser |
| 5, 6, 7 |
Overfill prevention equipment inspection(s) not completed (Required every 3 years). |
| 5, 6, 7 |
Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry. |
| 5, 6, 7 |
Triennial spill prevention equipment testing not completed. |