Division of Petroleum & Chemical Safety

 

Facility: 1046934 Tank: 4

Click for Facility/Tank Ownership history

Capacity: 20000
Product: E15
Status: Currently in use
Regulated Status Federal
OSFM First Notify Date: 3/26/2020
Current Age: 6
Install Date: 10/17/2019
Last Used Date:
Product Date:
Petroleum Use:
CERCLA Substance:
CAS Code:
Removed Date:
Abandoned Material:
Abandoned Date:
Red Tag Issue Date:
Fee Due: $0.00
UL Number D 5672 4432

Equipment Information

Equipment Type Equipment Install Date Last Passing Test Date Test Expire Date Failed Test Date
Corrosion Prot - Piping Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Tank Fiberglass Non-Corrosive N/A N/A
Leak Detect - Piping Mechanical Pressurized Line Leak Detection 8/22/2025 8/22/2025 8/22/2026
Leak Detect - Tank Automatic Tank Gauging Veeder Root TLS 450 Plus 3/27/2020 6/27/2025 6/27/2026
Leak Detect - Tank Non-Discriminating Interstitial Monitoring Sensors 3/27/2020 6/27/2025 6/27/2026
Overfill Prev Device Overfill Drop Tube Valve 3/27/2020 6/27/2025 6/27/2028
Piping Fiberglass Double Wall Ameron Dualoy 3000/LCX 3/27/2020 N/A N/A
Piping Single Wall STP/Tanktop Sump 3/27/2020 10/24/2022 10/24/2025
Leak Detect - Piping Sump Sensor 3/27/2020 6/27/2025 6/27/2026
Spill Contain Device Double Wall Spill Bucket 3/27/2020 4/29/2025 4/29/2028
Tank Fiberglass Double Wall XERXES 3/27/2020 N/A N/A

Latest Blended Fuel Compatibility Form

File Name Status Status Date
CompatibilityFormSummary10032025-075427.pdf Approved 10/3/2025

Compatibility Form Attachments

File Name Description
Ameron PSX-20 adhesive Query.pdf adhesive
846391-109 mag plus probe.pdf ATG Probe
Gilbarco Encore Series.pdf Dispenser
Gilbarco Encore Series.pdf Dispenser/included gaskets and seals
OPW parts proof emergency valve, overfill valve, spill container.pdf Double Wall Spill Bucket
xerxes.pdf Fiberglass Double Wall
ameron dualoy 3000 lcx data sheet.pdf Fiberglass Double Wall
IRPCO steelflex, FLEXSTEEL 559N hoses 2019-irpco-tsm-combined.pdf Hose
VR-0794390-409 577013-750-12_AE Veeder root interstitial monitor proof.pdf interstial sensor
_assets_products_documents_FE-Petro-mechanical-leak-detectors (1).pdf Mechanical Pressurized Line Leak Detection
P-2762 Sep2022_Catlow Elite Nozzle Brochure.pdf Nozzle
OPW parts proof emergency valve, overfill valve, spill container.pdf Overfill Drop Tube Valve
OPW parts proof emergency valve, overfill valve, spill container.pdf Shear Valve
PCI Sump specs pci-biodiesel.pdf Single Wall STP/Tanktop Sump
PCI Sump specs pci-biodiesel.pdf Single Wall UDC Sump
576047-305 red jacket motor e15 proof.pdf Submersible Turbine Pump
794380-208 veeder root.pdf Sump Sensor in Single Wall STP/Tanktop Sump

Additional Tests

Equipment Type Equipment Test Type Test Result Test Date History
Piping Fiberglass Double Wall Ameron Dualoy 3000/LCX Precision Test (Piping) Pass 6/27/2025 Show History
Tank Fiberglass Double Wall XERXES Precision Test (Tank) Pass 3/27/2020 Show History