Information
JB Pritzker, Governor
James A. Rivera, State Fire Marshal
Division of Petroleum & Chemical Safety
State of Illinois
Employment Opportunities
Ready Illinois
Find us on Facebook
UST
Search
Contractor Search
Permit Search
Disclaimer & Rules/Statutes
Disclaimer
Rules
Statutes
Statistics & Reports
Statistics
Red Tag Tanks
Blended Fuel Tanks
Federal Energy Act Reports
Help
Division of Petroleum & Chemical Safety
Facility: 2015385 Tank: 6
Click for Facility/Tank Ownership history
Capacity:
8000
Product:
Gasoline - Regular
Status:
Out of service
Regulated Status
Federal
OSFM
First Notify Date:
2/23/2006
Current Age:
19
Install Date:
1/11/2006
Last Used Date:
5/15/2024
Product Date:
1/11/2006
Petroleum Use:
None
CERCLA Substance:
CAS Code:
Removed Date:
Abandoned Material:
Abandoned Date:
Red Tag Issue Date:
8/6/2024
Fee Due:
$0.00
UL Number
Equipment Information
Equipment Type
Equipment
Install Date
Last Passing Test Date
Test Expire Date
Failed Test Date
Corrosion Prot - Piping
Fiberglass Non-Corrosive
12/6/2005
N/A
N/A
Corrosion Prot - Tank
Composite Non-Corrosive
12/6/2005
N/A
N/A
Leak Detect - Piping
Mechanical Pressurized Line Leak Detection
12/6/2005
9/9/2024
9/9/2025
Leak Detect - Tank
Automatic Tank Gauging Veeder Root TLS 350 with CSLD
12/6/2005
9/9/2024
9/9/2025
Overfill Prev Device
Overfill Drop Tube Valve
3/29/2019
3/30/2022
3/30/2025
Piping
Fiberglass Double Wall A.O. Smith
12/6/2005
N/A
N/A
Piping
Single Wall STP/Tanktop Sump
3/30/2022
3/30/2025
Leak Detect - Piping
Sump Sensor
9/9/2024
9/9/2025
Spill Contain Device
Double Wall Spill Bucket
1/8/2025
1/8/2025
1/8/2028
Tank
Composite Double Wall Glasteel II
12/6/2005
N/A
N/A
Latest Blended Fuel Compatibility Form
No Compatibility Forms Listed
Additional Tests
Equipment Type
Equipment
Test Type
Test Result
Test Date
History
Piping
Fiberglass Double Wall A.O. Smith
Precision Test (Piping)
Pass
9/9/2024
Show History
Tank
Composite Double Wall Glasteel II
Precision Test (Tank)
Pass
1/8/2025
Show History
Previous Page