Information
JB Pritzker, Governor
Michele L Pankow, State Fire Marshal
Division of Petroleum & Chemical Safety
State of Illinois
Employment Opportunities
Ready Illinois
Find us on Facebook
UST
Search
Contractor Search
Permit Search
Disclaimer & Rules/Statutes
Disclaimer
Rules
Statutes
Statistics & Reports
Statistics
Red Tag Tanks
Blended Fuel Tanks
Federal Energy Act Reports
Help
Division of Petroleum & Chemical Safety
Facility: 2010716 Tank: 2
Click for Facility/Tank Ownership history
Capacity:
8000
Product:
Gasoline - Premium
Status:
Abandoned in place
Regulated Status
Federal
OSFM
First Notify Date:
5/7/1986
Current Age:
41
Install Date:
1/1/1984
Last Used Date:
2/26/2022
Product Date:
1/1/1984
Petroleum Use:
CERCLA Substance:
CAS Code:
Removed Date:
Abandoned Material:
Inert material mixed with portland cement
Abandoned Date:
11/16/2022
Red Tag Issue Date:
Fee Due:
$0.00
UL Number
Equipment Information
Equipment Type
Equipment
Install Date
Last Passing Test Date
Test Expire Date
Failed Test Date
Corrosion Prot - Piping
Sacrificial Anode Flex Connector
1/14/2019
N/A
Corrosion Prot - Piping
Fiberglass Non-Corrosive
N/A
N/A
Corrosion Prot - Tank
Lining Materials Internal
10/18/2016
N/A
2/28/2022
Leak Detect - Piping
Electronic Pressurized Line Leak Detection
5/26/2021
N/A
5/4/2022
Leak Detect - Tank
Automatic Tank Gauging Incon TS 550 with SCALD
5/4/2022
N/A
Overfill Prev Device
Overfill Drop Tube Valve
5/26/2021
N/A
Piping
Flex Connector Steel
N/A
N/A
Piping
Fiberglass Single Wall Piping
N/A
N/A
Piping
Not Installed STP/Tanktop Sump
N/A
N/A
Spill Contain Device
Double Wall Spill Bucket
5/26/2021
N/A
Tank
Steel Single Wall
1/30/2006
N/A
N/A
Latest Blended Fuel Compatibility Form
No Compatibility Forms Listed
Additional Tests
Equipment Type
Equipment
Test Type
Test Result
Test Date
History
Piping
Fiberglass Single Wall Piping
Precision Test (Piping)
Pass
5/4/2022
Show History
Tank
Steel Single Wall
Precision Test (Tank)
Pass
7/23/2019
Show History
Previous Page