Division of Petroleum & Chemical Safety

 

Facility: 2006853 Tank: 3

Click for Facility/Tank Ownership history

Capacity: 10000
Product: E85
Status: Currently in use
Regulated Status Federal
OSFM First Notify Date: 3/31/1986
Current Age: 40
Install Date: 10/31/1984
Last Used Date:
Product Date:
Petroleum Use:
CERCLA Substance:
CAS Code:
Removed Date:
Abandoned Material:
Abandoned Date:
Red Tag Issue Date:
Fee Due: $0.00
UL Number

Equipment Information

Equipment Type Equipment Install Date Last Passing Test Date Test Expire Date Failed Test Date
Corrosion Prot - Piping Sacrificial Anode Flex Connector East 10/24/2023 10/24/2026
Corrosion Prot - Piping Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Tank Sacrificial Anode Cathodic Protection 3/9/2024 3/9/2024 3/9/2027
Leak Detect - Piping Mechanical Pressurized Line Leak Detection East 8/26/2024 8/26/2025
Leak Detect - Tank Automatic Tank Gauging Veeder Root TLS 300 8/26/2024 8/26/2025
Overfill Prev Device Overfill Drop Tube Valve East 9/13/2019 8/26/2024 8/26/2027
Piping Flexible Double Wall NUPI Smartflex 8/26/2024 N/A N/A
Piping Single Wall STP/Tanktop Sump 8/26/2024 8/26/2024 8/26/2027
Leak Detect - Piping Sump Sensor with positive shutdown 8/26/2024 8/26/2024 8/26/2025
Spill Contain Device Single Wall Spill Bucket East 8/26/2024 8/26/2027
Tank STIP3 Single Wall N/A N/A

Latest Blended Fuel Compatibility Form

File Name Status Status Date
CompatibilityFormSummary09062024-101051.pdf Approved 9/10/2024

Compatibility Form Attachments

File Name Description
Veeder Root E85 probe 577013-054.pdf ATG Probe
ul-approval-letter-ovation-blender-dispensers.pdf Dispenser
OPW Belowground Product Compatibility Listing 071518.pdf DOUBLEWALL
NUPI UL LETTER - COMPATIBILITY.pdf FLEXIBLE DOUBLE WALL
Goodyear E85 Ethanol hose.pdf Hose
FE Petro MLD Compatability.pdf Mechanical Pressurized Line Leak Detection
OPW 11a-and-11b-automatic-nozzles.pdf Nozzle
OPW 71SOM_Overfill_Prevention_Valve.pdf Overfill Drop Tube Valve East
Gasoila E-Seal.pdf PIPE DOPE
OPW 10 Plus Impact Compatibility.pdf Shear Valve
Bravo Sump Compatibility Statement.pdf SINGLE WALL BRAVO TANK TOP SUMP
NUPI UL LETTER - COMPATIBILITY.pdf Single Wall UDC Sump
STEEL TANK COMPATABILITY.pdf STIP3 Single Wall
FE PETRO STPAPM200-VL2 ffs-0412-60-hz-advanced-protection-submersible-turbine-pumps-datasheet.pdf STP
Veeder Root Sensor Compatibility Statement.pdf SUMP SENSORS W/ POSITIVE SHUT DOWN

Additional Tests

Equipment Type Equipment Test Type Test Result Test Date History
Piping Fiberglass Single Wall Piping Ameron Dualoy 3000/L Precision Test (Piping) Pass 10/24/2023 Show History
Piping Flexible Double Wall NUPI Smartflex Precision Test (Piping) Pass 8/26/2024 Show History