Division of Petroleum & Chemical Safety

 

Facility: 4040679 Tank: 3

Click for Facility/Tank Ownership history

Capacity: 20000
Product: Diesel Fuel
Status: Currently in use
Regulated Status Federal
OSFM First Notify Date: 2/11/2002
Current Age: 23
Install Date: 11/8/2001
Last Used Date:
Product Date: 11/8/2001
Petroleum Use:
CERCLA Substance:
CAS Code:
Removed Date:
Abandoned Material:
Abandoned Date:
Red Tag Issue Date:
Fee Due: $0.00
UL Number

Equipment Information

Equipment Type Equipment Install Date Last Passing Test Date Test Expire Date Failed Test Date
Corrosion Prot - Piping Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Piping Flexible Non-Corrosive 10/2/2001 N/A N/A
Corrosion Prot - Tank Fiberglass Non-Corrosive 10/2/2001 N/A N/A
Leak Detect - Piping Mechanical Pressurized Line Leak Detection West 4/8/2025 4/8/2026
Leak Detect - Piping Mechanical Pressurized Line Leak Detection East 4/8/2025 4/8/2026
Leak Detect - Tank Automatic Tank Gauging Veeder Root TLS 450 Plus with CSLD 1/24/2025 1/24/2026
Overfill Prev Device Overfill Alarm 10/2/2001 4/8/2025 4/8/2028
Piping Fiberglass Double Wall N/A N/A
Piping Flexible Double Wall A.P.T. Poly Tech N/A N/A
Piping Flex Connector Steel N/A N/A
Piping Single Wall STP/Tanktop Sump 4/8/2025 4/8/2028
Leak Detect - Piping Sump Sensor 1/24/2025 1/24/2026
Spill Contain Device Single Wall Spill Bucket West 2/6/2020 4/8/2025 4/8/2028
Spill Contain Device Single Wall Spill Bucket East 5/9/2019 4/8/2025 4/8/2028
Tank Fiberglass Single Wall N/A N/A

Latest Blended Fuel Compatibility Form

No Compatibility Forms Listed


Additional Tests

Equipment Type Equipment Test Type Test Result Test Date History
Piping Fiberglass Double Wall Precision Test (Piping) Pass 1/24/2025 Show History
Piping Flexible Double Wall A.P.T. Poly Tech Precision Test (Piping) Pass 1/18/2022 Show History