Information
JB Pritzker, Governor
James A. Rivera, State Fire Marshal
Division of Petroleum & Chemical Safety
State of Illinois
Employment Opportunities
Ready Illinois
Find us on Facebook
UST
Search
Contractor Search
Permit Search
Disclaimer & Rules/Statutes
Disclaimer
Rules
Statutes
Statistics & Reports
Statistics
Red Tag Tanks
Blended Fuel Tanks
Federal Energy Act Reports
Help
Division of Petroleum & Chemical Safety
Facility: 2023435 Tank: 4
Click for Facility/Tank Ownership history
Capacity:
4000
Product:
Diesel Fuel
Status:
Currently in use
Regulated Status
Federal
OSFM
First Notify Date:
1/7/1987
Current Age:
38
Install Date:
6/1/1986
Last Used Date:
Product Date:
6/1/1986
Petroleum Use:
CERCLA Substance:
CAS Code:
Removed Date:
Abandoned Material:
Abandoned Date:
Red Tag Issue Date:
Fee Due:
$0.00
UL Number
Equipment Information
Equipment Type
Equipment
Install Date
Last Passing Test Date
Test Expire Date
Failed Test Date
Corrosion Prot - Piping
Sacrificial Anode Flex Connector DISP 13/14
10/30/2024
10/30/2027
Corrosion Prot - Piping
Fiberglass Non-Corrosive
N/A
N/A
Corrosion Prot - Tank
Fiberglass Non-Corrosive
N/A
N/A
Leak Detect - Piping
European with No Test Req Suction
N/A
N/A
Leak Detect - Tank
Automatic Tank Gauging Veeder Root TLS 350 with CSLD
8/15/2006
5/7/2024
5/7/2025
Overfill Prev Device
Overfill Alarm
5/7/2024
5/7/2027
Overfill Prev Device
Overfill Drop Tube Valve
5/7/2024
5/7/2027
Piping
Fiberglass Double Wall Ameron Dualoy 3000/LCX
N/A
N/A
Piping
Single Wall STP/Tanktop Sump
Leak Detect - Piping
Piping Sump Sensors Not Regulated Not Installed
N/A
N/A
Spill Contain Device
Single Wall Spill Bucket
5/7/2024
5/7/2027
Tank
Fiberglass Single Wall
N/A
N/A
Latest Blended Fuel Compatibility Form
No Compatibility Forms Listed
Additional Tests
Equipment Type
Equipment
Test Type
Test Result
Test Date
History
Piping
Steel Single Wall Piping
Precision Test (Piping)
Pass
6/28/2019
Show History
Previous Page