Division of Petroleum & Chemical Safety

 

Facility: 2046017 Tank: 6

Click for Facility/Tank Ownership history

Capacity: 20000
Product: B-99
Status: Currently in use
Regulated Status Federal
OSFM First Notify Date: 4/28/2016
Current Age: 9
Install Date: 3/10/2016
Last Used Date:
Product Date:
Petroleum Use: None
CERCLA Substance:
CAS Code:
Removed Date:
Abandoned Material:
Abandoned Date:
Red Tag Issue Date:
Fee Due: $0.00
UL Number

Equipment Information

Equipment Type Equipment Install Date Last Passing Test Date Test Expire Date Failed Test Date
Corrosion Prot - Piping Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Tank Fiberglass Non-Corrosive N/A N/A
Leak Detect - Piping Mechanical Pressurized Line Leak Detection 1/10/2024 1/10/2025
Leak Detect - Tank Automatic Tank Gauging Veeder Root TLS 350 Plus 1/14/2025 1/14/2026
Leak Detect - Tank Non-Discriminating Interstitial Monitoring Sensors 1/14/2025 1/14/2026
Overfill Prev Device Overfill Drop Tube Valve 6/3/2025 6/3/2025 6/3/2028
Piping Fiberglass Double Wall Ameron Dualoy 3000/LCX N/A N/A
Piping Single Wall Transition Sump Shed 6/9/2023 6/9/2026
Leak Detect - Piping Sump Sensor with positive shutdown 1/14/2025 1/14/2026
Piping Single Wall Transition Sump North 6/6/2020 6/9/2023 6/9/2026
Leak Detect - Piping Sump Sensor with positive shutdown 1/14/2025 1/14/2026
Spill Contain Device Double Wall Spill Bucket 6/3/2025 6/3/2025 6/3/2028
Tank Fiberglass Double Wall XERXES N/A N/A

Latest Blended Fuel Compatibility Form

File Name Status Status Date
CompatibilityFormSummary10182022-161641.pdf Approved 10/18/2022

Compatibility Form Attachments

File Name Description
VR Mag Plus Probe Biodiesel Compatibility Letter 9-2-22.pdf ATG Probe
Xexes Biodiesel Compatibility Letter.pdf Fiberglass Double Wall
Dualoy 3000 LCX Data Sheet.pdf Fiberglass Double Wall
794380-345 Solid State Alternative Fuel Interstitial Sensor for Fiberglass Tanks.pdf Non-Discriminating Interstitial Monitoring Sensors
Veeder Root 794380-351 B100 Compatible.pdf Non-Discriminating Sump Sensor with positive shutdown in Single Wall Transition Sump
opw-fuel-compatibility-matrix-below-ground-products-2018.pdf Overfill Drop Tube Valve
NEF Sumps.pdf Single Wall Transition Sump
opw-fuel-compatibility-matrix-below-ground-products-2018.pdf Spill Bucket
Gorman Rupp Bio Pump.pdf Suction Pump

Additional Tests

Equipment Type Equipment Test Type Test Result Test Date History
Piping Fiberglass Double Wall Ameron Dualoy 3000/LCX Precision Test (Piping) Pass 12/10/2024 Show History
Tank Fiberglass Double Wall XERXES Precision Test (Tank) Pass 8/7/2020 Show History