Division of Petroleum & Chemical Safety

 

Facility: 7043916 Tank: 9

Click for Facility/Tank Ownership history

Capacity: 20000
Product: E85
Status: Currently in use
Regulated Status Federal
OSFM First Notify Date: 3/26/2009
Current Age: 17
Install Date: 7/1/2008
Last Used Date:
Product Date: 7/1/2008
Petroleum Use:
CERCLA Substance:
CAS Code:
Removed Date:
Abandoned Material:
Abandoned Date:
Red Tag Issue Date:
Fee Due: $0.00
UL Number

Equipment Information

Equipment Type Equipment Install Date Last Passing Test Date Test Expire Date Failed Test Date
Corrosion Prot - Piping Sacrificial Anode Flex Connector STP 5/4/2023 5/4/2026
Corrosion Prot - Piping Sacrificial Anode Flex Connector Disp. 5/6 5/4/2023 5/4/2026
Corrosion Prot - Piping Sacrificial Anode Flex Connector Disp. 3/4 5/4/2023 5/4/2026
Corrosion Prot - Piping Sacrificial Anode Flex Connector Disp. 7/8 5/4/2023 5/4/2026
Corrosion Prot - Piping Flexible Non-Corrosive N/A N/A
Corrosion Prot - Tank Fiberglass Non-Corrosive 1/11/2008 N/A N/A
Leak Detect - Piping Electronic Pressurized Line Leak Detection 5/6/2025 5/6/2026
Leak Detect - Tank Automatic Tank Gauging Veeder Root TLS 350 Plus with CSLD 5/6/2025 5/6/2026
Overfill Prev Device Ball Float Vent Valve EBW 308 1/11/2008 5/2/2024 5/2/2027
Piping Aboveground N/A N/A
Piping Flexible Double Wall A.P.T. Poly Tech N/A N/A
Piping Single Wall STP/Tanktop Sump
Leak Detect - Piping Piping Sump Sensors Not Regulated Not Installed N/A N/A
Spill Contain Device Single Wall Spill Bucket 1/11/2008 5/2/2024 5/2/2027
Tank Fiberglass Single Wall Containment Solutions 1/11/2008 N/A N/A
Vent, Riser, Fill Piping Steel risers N/A N/A

Latest Blended Fuel Compatibility Form

File Name Status Status Date
CompatibilityFormSummary08012022-123859.pdf Approved 8/1/2022

Additional Tests

Equipment Type Equipment Test Type Test Result Test Date History
Piping Flexible Double Wall A.P.T. Poly Tech Precision Test (Piping) Pass 5/6/2025 Show History