Division of Petroleum & Chemical Safety

 

Facility: 2047616 Tank: 3

Click for Facility/Tank Ownership history

Capacity: 10000
Product: E85
Status: Currently in use
Regulated Status Federal
OSFM First Notify Date: 10/17/2023
Current Age: 1
Install Date: 9/19/2023
Last Used Date:
Product Date: 4/4/2024
Petroleum Use:
CERCLA Substance:
CAS Code:
Removed Date:
Abandoned Material:
Abandoned Date:
Red Tag Issue Date:
Fee Due: $0.00
UL Number F77164824

Equipment Information

Equipment Type Equipment Install Date Last Passing Test Date Test Expire Date Failed Test Date
Corrosion Prot - Piping Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Tank Composite Non-Corrosive N/A N/A
Leak Detect - Piping Electronic Pressurized Line Leak Detection 4/10/2024 3/17/2025 3/17/2026
Leak Detect - Tank Automatic Tank Gauging Veeder Root TLS 450 Plus 3/17/2025 3/17/2025 3/17/2026
Leak Detect - Tank Non-Discriminating Interstitial Monitoring Sensors With Monitor 4/10/2024 3/17/2025 3/17/2026
Overfill Prev Device Overfill Drop Tube Valve 4/2/2024 4/2/2024 4/2/2027
Piping Fiberglass Double Wall Ameron Dualoy 3000/LCX 4/10/2024 N/A N/A
Piping Single Wall STP/Tanktop Sump 4/10/2024 11/7/2023 11/7/2026
Leak Detect - Piping Sump Sensor with positive shutdown 4/10/2024 3/17/2025 3/17/2026
Spill Contain Device Double Wall Spill Bucket 11/7/2023 11/7/2023 11/7/2026
Tank Composite Double Wall Lannon 9/19/2023 N/A N/A

Latest Blended Fuel Compatibility Form

File Name Status Status Date
CompatibilityFormSummary12052024-135403.pdf Approved 12/5/2024

Compatibility Form Attachments

File Name Description
e85 veeder probe.pdf ATG Probe
e85 veeder probe.pdf ATG Probe
E85 tanks.pdf Composite Double Wall
e85 franklin spill.pdf Double Wall Spill Bucket
e85 plld.pdf Electronic Pressurized Line Leak Detection
e85 frp pipe.pdf Fiberglass Double Wall
e85 dope.pdf Gasoila E Seal
e85 dope.pdf Gasoila E Seal
e85 gilbarco.pdf Gilbarco
e85 gilbarco.pdf Gilbarco
E85 all.pdf Hose
E85 all.pdf Hose
E85 sensors.pdf Non-Discriminating Interstitial Monitoring Sensors With Monitor
e85 opw.pdf Nozzle
e85 opw.pdf Nozzle
e85 drop tube.pdf Overfill Drop Tube Valve
e85 bravo.pdf Single Wall STP/Tanktop Sump
e85 bravo.pdf Single Wall UDC Sump
e85 franklin all.pdf Submersible Turbine Pump
e85 franklin all.pdf Submersible Turbine Pump
E85 sensors.pdf Sump Sensor with positive shutdown in Single Wall STP/Tanktop Sump

Additional Tests

Equipment Type Equipment Test Type Test Result Test Date History
Piping Fiberglass Double Wall Ameron Dualoy 3000/LCX Precision Test (Piping) Pass 4/10/2024 Show History
Tank Composite Double Wall Lannon Precision Test (Tank) Pass 4/10/2024 Show History