Division of Petroleum & Chemical Safety

 

Facility: 4043622 Tank: 8

Click for Facility/Tank Ownership history

Capacity: 30000
Product: Diesel Fuel
Status: Currently in use
Regulated Status Federal
OSFM First Notify Date: 10/23/2024
Current Age: 0
Install Date: 7/3/2024
Last Used Date:
Product Date: 10/18/2024
Petroleum Use: None
CERCLA Substance:
CAS Code:
Removed Date:
Abandoned Material:
Abandoned Date:
Red Tag Issue Date:
Fee Due: $0.00
UL Number 91011973

Equipment Information

Equipment Type Equipment Install Date Last Passing Test Date Test Expire Date Failed Test Date
Corrosion Prot - Piping Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Tank Fiberglass Non-Corrosive N/A N/A
Leak Detect - Piping Mechanical Pressurized Line Leak Detection 11/7/2024 11/7/2024 11/7/2025
Leak Detect - Tank Automatic Tank Gauging Veeder Root TLS 350 11/7/2024 11/7/2024 11/7/2025
Leak Detect - Tank Non-Discriminating Interstitial Monitoring Sensors 11/7/2024 11/7/2024 11/7/2025
Overfill Prev Device Overfill Drop Tube Valve 10/23/2024 10/23/2024 10/23/2027
Piping Fiberglass Double Wall Ameron Dualoy 3000/LCX 11/7/2024 N/A N/A
Piping Single Wall STP/Tanktop Sump 9/11/2024 4/8/2025 4/8/2028
Leak Detect - Piping Sump Sensor with positive shutdown 11/7/2024 11/7/2024 11/7/2025
Piping Double Wall Transition Sump Blending Shed 9/11/2024 4/8/2025 4/8/2028
Piping Single Wall Transition Sump Southwest 4/8/2025 4/8/2028
Leak Detect - Piping Sump Sensor with positive shutdown 11/7/2024 11/7/2025
Piping Single Wall Transition Sump Disp 20 North 9/11/2024 9/11/2027
Leak Detect - Piping Sump Sensor with positive shutdown 2/7/2025 2/7/2025 2/7/2026
Piping Single Wall Transition Sump Disp 20 South 9/11/2024 9/11/2027
Leak Detect - Piping Sump Sensor with positive shutdown 11/7/2024 11/7/2025
Spill Contain Device Double Wall Spill Bucket 9/11/2024 4/27/2025 4/27/2028
Tank Fiberglass Double Wall XERXES 7/3/2024 N/A N/A

Latest Blended Fuel Compatibility Form

No Compatibility Forms Listed


Additional Tests

Equipment Type Equipment Test Type Test Result Test Date History
Piping Fiberglass Double Wall Ameron Dualoy 3000/LCX Precision Test (Piping) Pass 11/7/2024 Show History
Tank Fiberglass Double Wall XERXES Precision Test (Tank) Pass 11/7/2024 Show History