Division of Petroleum & Chemical Safety

 

Facility: 2014287 Tank: 8

Click for Facility/Tank Ownership history

Capacity: 4000
Product: E85
Status: Currently in use
Regulated Status Federal
OSFM First Notify Date: 6/18/1999
Current Age: 26
Install Date: 6/25/1999
Last Used Date:
Product Date:
Petroleum Use:
CERCLA Substance:
CAS Code:
Removed Date:
Abandoned Material:
Abandoned Date:
Red Tag Issue Date:
Fee Due: $0.00
UL Number

Equipment Information

Equipment Type Equipment Install Date Last Passing Test Date Test Expire Date Failed Test Date
Corrosion Prot - Piping Fiberglass Non-Corrosive 5/20/1999 N/A N/A
Corrosion Prot - Tank Lining Materials Internal Bridgeport Chemical Glass Armor GA 27P 6/24/2020 6/24/2020 6/24/2025
Corrosion Prot - Tank Fiberglass Non-Corrosive 5/20/1999 N/A N/A
Leak Detect - Piping Mechanical Pressurized Line Leak Detection 1/14/2021 2/14/2025 2/14/2026
Leak Detect - Tank Automatic Tank Gauging Veeder Root TLS 350 with CSLD 2/18/2021 2/14/2025 2/14/2026
Overfill Prev Device Overfill Drop Tube Valve 2/8/2024 2/8/2024 2/8/2027
Piping Fiberglass Single Wall Piping A.O. Smith 1/14/2021 N/A N/A
Piping Stainless Steel Single Wall Piping 1/14/2021 N/A N/A
Piping Single Wall STP/Tanktop Sump
Leak Detect - Piping Piping Sump Sensors Not Regulated Not Installed N/A N/A
Spill Contain Device Single Wall Spill Bucket 1/14/2021 3/13/2025 3/13/2028
Tank Fiberglass Single Wall Containment Solutions 5/20/1999 N/A N/A

Latest Blended Fuel Compatibility Form

File Name Status Status Date
CompatibilityFormSummary06092025-064138.pdf Approved 6/9/2025

Compatibility Form Attachments

File Name Description
Veeder-Root tank probe.pdf ATG Probe
wayne dispensers all.pdf Dispenser
NOV fiberglass pipe.pdf Fiberglass Single Wall Piping
opw all products.pdf Fill cap
continental flexsteel hoses.pdf Hose
bridgeport+tank+lining.pdf Lining Materials Internal
Franklin MLD AG.pdf Mechanical Pressurized Line Leak Detection
catlow nozzles breakaways swivels.pdf Nozzle
71SOM_Overfill_Prevention_Valve.pdf Overfill Drop Tube Valve
opw shear valves.pdf Shear Valve
franklin spill containers.pdf Single Wall Spill Bucket
FFS-0691+UL+2447+Product+Description+Datasheet.pdf Single Wall STP/Tanktop Sump
FFS LMM UDC.pdf Single Wall UDC Sump
franklin stp.pdf Submersible Turbine Pump
gasoila dope.pdf Thread sealant

Additional Tests

Equipment Type Equipment Test Type Test Result Test Date History
Piping Fiberglass Single Wall Piping A.O. Smith Precision Test (Piping) Pass 2/14/2025 Show History
Piping Fiberglass Single Wall Piping A.O. Smith Precision Test (Piping) Pass 2/7/2020 Show History
Piping Fiberglass Single Wall Piping A.O. Smith Precision Test (Piping) Pass 7/13/2020 Show History
Piping Galvanized Steel Single Wall Piping Precision Test (Piping) Pass 7/13/2020 Show History
Piping Galvanized Steel Single Wall Piping Precision Test (Piping) Pass 1/14/2021 Show History
Piping Stainless Steel Single Wall Piping Precision Test (Piping) Pass 12/30/2021 Show History
Piping Stainless Steel Single Wall Piping Precision Test (Piping) Pass 7/13/2020 Show History
Tank Fiberglass Single Wall Containment Solutions Precision Test (Tank) Pass 1/30/2023 Show History