7 |
Annual electronic line leak detector test not completed. |
5, 6, 7, 8, 9 |
Dispensers - hoses cracked, split or worn and require replacement |
6, 8, 9 |
Line interstitial sensor functional test not accomplished (Required annually). |
6, 8, 9 |
Line interstitial sensors have been raised and rendered inoperational. - Diesel Islands North remote fill sump. |
6, 8, 9 |
Line leak detection equipment in alarm or failed test, must repair or replace. - L2 Setup data warning. |
6 |
Miscellaneous - Dispensers - the following are actively leaking and require immediate repair |
6 |
Miscellaneous - Section 174.370 General Requirement to Maintain All Equipment |
8 |
Miscellaneous - Dispensers - the following are actively leaking and require immediate repair |
8 |
Miscellaneous - Section 174.370 General Requirement to Maintain All Equipment |
9 |
Miscellaneous - Dispensers - the following are actively leaking and require immediate repair |
9 |
Miscellaneous - Section 174.370 General Requirement to Maintain All Equipment |
7 |
Open electrical conduit or junction boxes. - Probe junction box needs replaced. |
5, 7 |
Overfill prevention equipment inspection(s) not completed (Required every 3 years). |
6, 8, 9 |
Piping containment sump failed triennial testing. Repair or replace. - Diesel Islands |
6, 8, 9 |
Piping interstitial must be open in all sumps |
8, 9 |
Required monthly tank interstitial sensor records not available. |
6 |
Required monthly tank leak test records not available. - Warren Rogers Assoc. PetroNetwork S3 CITLDS Version D |
9 |
Tank interstitial sensors in alarm or failed test, must repair or replace. - L:19 Setup Data Warning |
6 |
Tank precision test required. - Required annually. |
6 |
Water in containment with required interstitial sensors - Remove water and repair containments to prevent water ingress. - North diesel remote fill sump. |
6, 8, 9 |
Water in dispenser containment with interstitial sensors - Remove water and repair containments to prevent water ingress - Dispenser 18 |