Division of Petroleum & Chemical Safety

 

Facility Details

Facility Number: 4047560
Status: Active
Facility Name: QT #7194
Address: 1505 N Neil Street Champaign, IL 61821
County: Champaign
Property Parcel: 41-20-01-401-036
Facility Type: Attended Self-Service Station
Owner Type: Private
Green Tag Decal: Z003622
Green Tag Issue Date: 3/5/2024
Green Tag Expiration Date: 12/31/2026

Owner Details

Owner Name: QuikTrip Corporation
Owner Address: 4705 South 129th East Ave. Tulsa, OK 74134
Owner Status: Current Owner
Purchase Date: 8/23/2021
Type of Financial Responsibility: Commercial Insurance
Financial Responsibility Reporting Due Date: 4/11/2026

Motor Fuel Dispensing Permits

MFD Permit Type Issue Date Expiration Date
Self Service 3/5/2024 12/31/2026

Owner Summary

Click for Facility/Tank Ownership history
Owner Number Owner Name Owner Status Purchase Date
U0034559 QuikTrip Corporation, Current Owner 8/23/2021

Permits (Unexpired)

Click for permit history

No Active Permits Found

Notice of Violatlions (Current)

NOV Number: E0020251549 (Pending)    Issue Date: 6/18/2025    Expiration Date: 8/17/2025    View NOV Form

Tanks Violations
Facility Annual Emergency Stop Inspection not completed or inspection report not available.
1, 2, 3, 4, 5, 6, 7 Annual leak detection certification not completed (Required annually).
1, 2, 3, 4, 5, 6, 7 Line interstitial sensor functional test not accomplished (Required annually).
Facility Missing copies of Annual Walkthrough Inspection Report.
1, 2, 3, 4, 5, 6, 7 Shear valve inspection report not completed (Required during Annual Walkthrough Inspection).
1, 2, 3, 4, 5, 6, 7 Tank interstitial sensor functional test not accomplished (Required annually).

IEMA Numbers Associated with the Facility

No IEMA Numbers Found

LUST Fund Eligibility and Deductibility Determinations

No Applications Found

Pay Tank Fees Online

Tank Information



Tank Number 1

Capacity: 20000 Petroleum Use:
Product: Gasoline - Regular CERCLA Substance:
Status: Currently in use CAS Code:
Regulated Status: Federal Removed Date:
OSFM First Notify Date: 2/5/2024 Abandoned Material:
Current Age: 2 Abandoned Date:
Install Date: 6/22/2023 Red Tag Issue Date:
Last Used Date: Fee Due: $0.00
Product Date:

Equipment

Equipment Type Equipment Last Passing Date Test Expire Date
Corrosion Prot - Piping Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Piping Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Tank Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Tank Fiberglass Non-Corrosive N/A N/A
Leak Detect - Piping Electronic Pressurized Line Leak Detection 2/8/2025 2/8/2026
Leak Detect - Tank Hydrostatic Reservoir Interstitial Monitoring Sensors with monitor 2/8/2025 2/8/2026
Overfill Prev Device Overfill Drop Tube Valve 2/5/2024 2/5/2027
Piping Flexible Double Wall Franklin Fueling Systems UPP N/A N/A
Piping Single Wall STP/Tanktop Sump 10/26/2023 10/26/2026
Leak Detect - Piping Sump Sensor with positive shutdown 2/8/2025 2/8/2026
Piping Single Wall Transition Sump 10/26/2023 10/26/2026
Leak Detect - Piping Sump Sensor with positive shutdown 2/8/2025 2/8/2026
Spill Contain Device Double Wall Spill Bucket 10/26/2023 10/26/2026
Tank Fiberglass Double Wall XERXES N/A N/A

Additional Tests

Equipment Type Equipment Test Type Test Result Test Date
Piping Flexible Double Wall Franklin Fueling Systems UPP Precision Test (Piping) Pass 2/8/2025
Tank Fiberglass Double Wall XERXES Precision Test (Tank) Pass 2/21/2024



Tank Number 2

Capacity: 20000 Petroleum Use:
Product: Gasoline - Regular CERCLA Substance:
Status: Currently in use CAS Code:
Regulated Status: Federal Removed Date:
OSFM First Notify Date: 2/5/2024 Abandoned Material:
Current Age: 2 Abandoned Date:
Install Date: 6/22/2023 Red Tag Issue Date:
Last Used Date: Fee Due: $0.00
Product Date:

Equipment

Equipment Type Equipment Last Passing Date Test Expire Date
Corrosion Prot - Piping Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Piping Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Tank Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Tank Fiberglass Non-Corrosive N/A N/A
Leak Detect - Piping Electronic Pressurized Line Leak Detection 2/8/2025 2/8/2026
Leak Detect - Tank Hydrostatic Reservoir Interstitial Monitoring Sensors with monitor 2/8/2025 2/8/2026
Overfill Prev Device Overfill Drop Tube Valve 2/5/2024 2/5/2027
Piping Flexible Double Wall Franklin Fueling Systems UPP N/A N/A
Piping Single Wall STP/Tanktop Sump 10/26/2023 10/26/2026
Leak Detect - Piping Sump Sensor with positive shutdown 2/8/2025 2/8/2026
Piping Single Wall Transition Sump 10/26/2023 10/26/2026
Leak Detect - Piping Sump Sensor with positive shutdown 2/8/2025 2/8/2026
Spill Contain Device Double Wall Spill Bucket 10/26/2023 10/26/2026
Tank Fiberglass Double Wall XERXES N/A N/A

Additional Tests

Equipment Type Equipment Test Type Test Result Test Date
Piping Flexible Double Wall Franklin Fueling Systems UPP Precision Test (Piping) Pass 2/8/2025
Tank Fiberglass Double Wall XERXES Precision Test (Tank) Pass 2/21/2024



Tank Number 3

Capacity: 20000 Petroleum Use:
Product: Gasoline - Non Ethanol CERCLA Substance:
Status: Currently in use CAS Code:
Regulated Status: Federal Removed Date:
OSFM First Notify Date: 2/5/2024 Abandoned Material:
Current Age: 2 Abandoned Date:
Install Date: 6/22/2023 Red Tag Issue Date:
Last Used Date: Fee Due: $0.00
Product Date:

Equipment

Equipment Type Equipment Last Passing Date Test Expire Date
Corrosion Prot - Piping Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Piping Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Tank Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Tank Fiberglass Non-Corrosive N/A N/A
Leak Detect - Piping Electronic Pressurized Line Leak Detection 2/8/2025 2/8/2026
Leak Detect - Tank Hydrostatic Reservoir Interstitial Monitoring Sensors with monitor 2/8/2025 2/8/2026
Overfill Prev Device Overfill Drop Tube Valve 2/5/2024 2/5/2027
Piping Flexible Double Wall Franklin Fueling Systems UPP N/A N/A
Piping Single Wall STP/Tanktop Sump 10/26/2023 10/26/2026
Leak Detect - Piping Sump Sensor with positive shutdown 2/8/2025 2/8/2026
Piping Single Wall Transition Sump 10/26/2023 10/26/2026
Leak Detect - Piping Sump Sensor with positive shutdown 2/8/2025 2/8/2026
Spill Contain Device Double Wall Spill Bucket 10/26/2023 10/26/2026
Tank Fiberglass Double Wall XERXES N/A N/A

Additional Tests

Equipment Type Equipment Test Type Test Result Test Date
Piping Flexible Double Wall Franklin Fueling Systems UPP Precision Test (Piping) Pass 2/8/2025
Tank Fiberglass Double Wall XERXES Precision Test (Tank) Pass 2/21/2024



Tank Number 4

Capacity: 20000 Petroleum Use:
Product: Gasoline - Premium CERCLA Substance:
Status: Currently in use CAS Code:
Regulated Status: Federal Removed Date:
OSFM First Notify Date: 2/5/2024 Abandoned Material:
Current Age: 2 Abandoned Date:
Install Date: 6/22/2023 Red Tag Issue Date:
Last Used Date: Fee Due: $0.00
Product Date:

Equipment

Equipment Type Equipment Last Passing Date Test Expire Date
Corrosion Prot - Piping Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Piping Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Tank Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Tank Fiberglass Non-Corrosive N/A N/A
Leak Detect - Piping Electronic Pressurized Line Leak Detection 2/8/2025 2/8/2026
Leak Detect - Tank Hydrostatic Reservoir Interstitial Monitoring Sensors with monitor 2/8/2025 2/8/2026
Overfill Prev Device Overfill Drop Tube Valve 2/5/2024 2/5/2027
Piping Flexible Double Wall Franklin Fueling Systems UPP N/A N/A
Piping Single Wall STP/Tanktop Sump 10/26/2023 10/26/2026
Leak Detect - Piping Sump Sensor with positive shutdown 2/8/2025 2/8/2026
Piping Single Wall Transition Sump 10/26/2023 10/26/2026
Leak Detect - Piping Sump Sensor with positive shutdown 2/8/2025 2/8/2026
Spill Contain Device Double Wall Spill Bucket 10/26/2023 10/26/2026
Tank Fiberglass Double Wall XERXES N/A N/A

Additional Tests

Equipment Type Equipment Test Type Test Result Test Date
Piping Flexible Double Wall Franklin Fueling Systems UPP Precision Test (Piping) Pass 2/8/2025
Tank Fiberglass Double Wall XERXES Precision Test (Tank) Pass 2/21/2024



Tank Number 5

Capacity: 18000 Petroleum Use: None
Product: B-99 CERCLA Substance:
Status: Currently in use CAS Code:
Regulated Status: Federal Removed Date:
OSFM First Notify Date: 2/5/2024 Abandoned Material:
Current Age: 2 Abandoned Date:
Install Date: 6/29/2023 Red Tag Issue Date:
Last Used Date: Fee Due: $0.00
Product Date:

Equipment

Equipment Type Equipment Last Passing Date Test Expire Date
Corrosion Prot - Piping Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Piping Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Tank Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Tank Fiberglass Non-Corrosive N/A N/A
Leak Detect - Piping Electronic Pressurized Line Leak Detection 2/8/2025 2/8/2026
Leak Detect - Tank Hydrostatic Reservoir Interstitial Monitoring Sensors with monitor 2/8/2025 2/8/2026
Overfill Prev Device Overfill Drop Tube Valve 2/5/2024 2/5/2027
Piping Flexible Double Wall Franklin Fueling Systems UPP N/A N/A
Piping Single Wall STP/Tanktop Sump 10/26/2023 10/26/2026
Leak Detect - Piping Sump Sensor with positive shutdown 2/8/2025 2/8/2026
Piping Single Wall Transition Sump 10/26/2023 10/26/2026
Leak Detect - Piping Sump Sensor with positive shutdown 2/8/2025 2/8/2026
Spill Contain Device Double Wall Spill Bucket 10/26/2023 10/26/2026
Tank Fiberglass Double Wall XERXES N/A N/A

Additional Tests

Equipment Type Equipment Test Type Test Result Test Date
Piping Flexible Double Wall Franklin Fueling Systems UPP Precision Test (Piping) Pass 2/8/2025
Tank Fiberglass Double Wall XERXES Precision Test (Tank) Pass 2/21/2024



Tank Number 6

Capacity: 30000 Petroleum Use: None
Product: Diesel Fuel CERCLA Substance:
Status: Currently in use CAS Code:
Regulated Status: Federal Removed Date:
OSFM First Notify Date: 2/5/2024 Abandoned Material:
Current Age: 2 Abandoned Date:
Install Date: 6/29/2023 Red Tag Issue Date:
Last Used Date: Fee Due: $0.00
Product Date:

Equipment

Equipment Type Equipment Last Passing Date Test Expire Date
Corrosion Prot - Piping Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Piping Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Tank Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Tank Fiberglass Non-Corrosive N/A N/A
Leak Detect - Piping Electronic Pressurized Line Leak Detection 2/8/2025 2/8/2026
Leak Detect - Tank Hydrostatic Reservoir Interstitial Monitoring Sensors with monitor 2/8/2025 2/8/2026
Overfill Prev Device Overfill Drop Tube Valve 2/5/2024 2/5/2027
Piping Flexible Double Wall Franklin Fueling Systems UPP N/A N/A
Piping Single Wall STP/Tanktop Sump 10/26/2023 10/26/2026
Leak Detect - Piping Sump Sensor with positive shutdown 2/8/2025 2/8/2026
Piping Single Wall Transition Sump 10/26/2023 10/26/2026
Leak Detect - Piping Sump Sensor with positive shutdown 2/8/2025 2/8/2026
Spill Contain Device Double Wall Spill Bucket 10/26/2023 10/26/2026
Tank Fiberglass Double Wall XERXES N/A N/A

Additional Tests

Equipment Type Equipment Test Type Test Result Test Date
Piping Flexible Double Wall Franklin Fueling Systems UPP Precision Test (Piping) Pass 2/8/2025
Tank Fiberglass Double Wall XERXES Precision Test (Tank) Pass 2/21/2024



Tank Number 7

Capacity: 30000 Petroleum Use: None
Product: Diesel Fuel CERCLA Substance:
Status: Currently in use CAS Code:
Regulated Status: Federal Removed Date:
OSFM First Notify Date: 2/5/2024 Abandoned Material:
Current Age: 2 Abandoned Date:
Install Date: 6/29/2023 Red Tag Issue Date:
Last Used Date: Fee Due: $0.00
Product Date:

Equipment

Equipment Type Equipment Last Passing Date Test Expire Date
Corrosion Prot - Piping Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Piping Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Tank Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Tank Fiberglass Non-Corrosive N/A N/A
Leak Detect - Piping Electronic Pressurized Line Leak Detection 2/8/2025 2/8/2026
Leak Detect - Tank Hydrostatic Reservoir Interstitial Monitoring Sensors with monitor 2/8/2025 2/8/2026
Overfill Prev Device Overfill Drop Tube Valve 2/5/2024 2/5/2027
Piping Flexible Double Wall Franklin Fueling Systems UPP N/A N/A
Piping Single Wall STP/Tanktop Sump 10/26/2023 10/26/2026
Leak Detect - Piping Sump Sensor with positive shutdown 2/8/2025 2/8/2026
Piping Single Wall Transition Sump 10/26/2023 10/26/2026
Leak Detect - Piping Sump Sensor with positive shutdown 2/8/2025 2/8/2026
Spill Contain Device Double Wall Spill Bucket 10/26/2023 10/26/2026
Tank Fiberglass Double Wall XERXES N/A N/A

Additional Tests

Equipment Type Equipment Test Type Test Result Test Date
Piping Flexible Double Wall Franklin Fueling Systems UPP Precision Test (Piping) Pass 2/8/2025
Tank Fiberglass Double Wall XERXES Precision Test (Tank) Pass 2/21/2024

Dispenser Information



Name\ID 1/2

Status: Active
Equipment Type Equipment Last Passing Date Test Expire Date
Dispenser Single Wall UDC Sump 10/26/2023 10/26/2026
Leak Detect - Piping Sump Sensor with positive shutdown 2/8/2025 2/8/2026



Name\ID 11/12

Status: Active
Equipment Type Equipment Last Passing Date Test Expire Date
Dispenser Single Wall UDC Sump 10/26/2023 10/26/2026
Leak Detect - Piping Sump Sensor with positive shutdown 2/8/2025 2/8/2026



Name\ID 13/14

Status: Active
Equipment Type Equipment Last Passing Date Test Expire Date
Dispenser Single Wall UDC Sump 10/26/2023 10/26/2026
Leak Detect - Piping Sump Sensor with positive shutdown 2/8/2025 2/8/2026



Name\ID 15/16

Status: Active
Equipment Type Equipment Last Passing Date Test Expire Date
Dispenser Single Wall UDC Sump 10/26/2023 10/26/2026
Leak Detect - Piping Sump Sensor with positive shutdown 2/8/2025 2/8/2026



Name\ID 1M/2M

Status: Active
Equipment Type Equipment Last Passing Date Test Expire Date
Dispenser Single Wall UDC Sump 10/26/2023 10/26/2026
Leak Detect - Piping Sump Sensor with positive shutdown 2/8/2025 2/8/2026



Name\ID 2S/3M

Status: Active
Equipment Type Equipment Last Passing Date Test Expire Date
Dispenser Single Wall UDC Sump 10/26/2023 10/26/2026
Leak Detect - Piping Sump Sensor with positive shutdown 2/8/2025 2/8/2026



Name\ID 3/4

Status: Active
Equipment Type Equipment Last Passing Date Test Expire Date
Dispenser Single Wall UDC Sump 10/26/2023 10/26/2026
Leak Detect - Piping Sump Sensor with positive shutdown 2/8/2025 2/8/2026



Name\ID 3S/4M

Status: Active
Equipment Type Equipment Last Passing Date Test Expire Date
Dispenser Single Wall UDC Sump 10/26/2023 10/26/2026
Leak Detect - Piping Sump Sensor with positive shutdown 2/8/2025 2/8/2026



Name\ID 4S/5M

Status: Active
Equipment Type Equipment Last Passing Date Test Expire Date
Dispenser Single Wall UDC Sump 10/26/2023 10/26/2026
Leak Detect - Piping Sump Sensor with positive shutdown 2/8/2025 2/8/2026



Name\ID 5/6

Status: Active
Equipment Type Equipment Last Passing Date Test Expire Date
Dispenser Single Wall UDC Sump 10/26/2023 10/26/2026
Leak Detect - Piping Sump Sensor with positive shutdown 2/8/2025 2/8/2026



Name\ID 5S/6M

Status: Active
Equipment Type Equipment Last Passing Date Test Expire Date
Dispenser Single Wall UDC Sump 10/26/2023 10/26/2026
Leak Detect - Piping Sump Sensor with positive shutdown 2/8/2025 2/8/2026



Name\ID 7/8

Status: Active
Equipment Type Equipment Last Passing Date Test Expire Date
Dispenser Single Wall UDC Sump 10/26/2023 10/26/2026
Leak Detect - Piping Sump Sensor with positive shutdown 2/8/2025 2/8/2026



Name\ID 9/10

Status: Active
Equipment Type Equipment Last Passing Date Test Expire Date
Dispenser Single Wall UDC Sump 10/26/2023 10/26/2026
Leak Detect - Piping Sump Sensor with positive shutdown 2/8/2025 2/8/2026

MFD Motorfuel Dispensing Forms

Facility Number Name City Received Date Letter
4047560 QT #7194 Champaign 02/03/2024 Letter Form