| Facility |
A/B operator retraining required as a result of issuance of the Notice of Violation and must be completed within 30 days. - Anthony Galle has to leave a copy of his A/B operator license on site. |
| Facility |
Annual Emergency Stop Inspection not completed or inspection report not available. |
| 1, 2, 3 |
Miscellaneous - Middle Islands. |
| Facility |
Missing copies of Annual Walkthrough Inspection Report. |
| 1, 2, 3 |
Monthly line interstitial sensor records not available. - Only have 4 months out of last 14 months. |
| 1, 2, 3 |
Precision tank test required. |
| 1, 2, 3 |
Required monthly tank leak test records not available. - Only have 4 months out of last 14 months. |
| 1, 2, 3 |
Shear valve inspection report not completed (Required during Annual Walkthrough Inspection). |
| 1, 2, 3 |
Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry. |
| 1, 2, 3 |
Tank monitor does not appear to function properly and requires maintenance. - Has multiple alarms on it. |
| 1, 2, 3 |
Water in containment with required interstitial sensors - Remove water and repair containments to prevent water ingress. - T1 STP, UDC'S 1/2 and 7/8 has water in containment sumps. |