Facility |
A/B operator retraining required as a result of issuance of the Notice of Violation - Anthony Galle has to retake operator training. Is not leaving CSLD passing tank reports. |
6, 7, 8, 9 |
Annual electronic line leak detector test not completed. |
Facility |
Annual Emergency Stop Inspection not completed or inspection report not available. |
6, 7, 8, 9 |
Annual leak detection certification not completed (Required annually). |
Facility |
Financial responsibility must be reported yearly |
6, 7, 8, 9 |
Line interstitial sensor functional test not accomplished (Required annually). |
6, 7, 8, 9 |
Line interstitial sensors have been raised and rendered inoperational. |
Facility |
Missing copies of Annual Walkthrough Inspection Report. |
6, 7, 9 |
Overfill prevention equipment inspection(s) not completed (Required every 3 years). |
6, 7, 8, 9 |
Piping interstitial must be open in all sumps |
6, 7, 8, 9 |
Required monthly tank leak test records not available. |
6, 7, 8, 9 |
Shear valve inspection report not completed (Required during Annual Walkthrough Inspection). |
6, 7 |
Shear valve(s) not properly mounted and/or not at proper height. |
6, 7, 8, 9 |
Tank precision test required. |
6, 7, 8, 9 |
Triennial spill prevention equipment testing not completed. |
6, 7 |
Water in containment with required interstitial sensors - Remove water and repair containments to prevent water ingress. - STP Sumps. |