| 1 |
Containment support components are cracked, deteriorated or missing. The cover and supporting components that are defective shall be replaced with factory manufactured components. - Spill bucket support components deteriorated |
| 1 |
Containment support components are cracked, deteriorated or missing. The cover and supporting components that are defective shall be replaced with factory manufactured components. - Transition ground cover missing handles- repair or replace handles to allow for inspection. |
| 3 |
Containment support components are cracked, deteriorated or missing. The cover and supporting components that are defective shall be replaced with factory manufactured components. - ATG ground cover support components missing. |
| 3 |
Containment support components are cracked, deteriorated or missing. The cover and supporting components that are defective shall be replaced with factory manufactured components. - STP ground cover deteriorated repair or replace. Also missing handles to allow for inspection. |
| 3 |
Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry. |
| 1 |
Triennial testing for qualifying piping containment sump not completed (Required every 3 years). - Transition sump testing past due 11/3/2025 |