Division of Petroleum & Chemical Safety

 

Facility Details

Facility Number: 2047459
Status: Active
Facility Name: Lenny's Gas N Wash Plano LLC
Address: 10000 E. Route 34
Plano, IL 60545
County: Kendall
Property Parcel: 01-25-200-019; 01-24-400-041
Facility Type: Attended Self-Service Station
Owner Type: Private
Green Tag Decal: Y002764
Green Tag Issue Date: 4/27/2023
Green Tag Expiration Date: 12/31/2025

Owner Details

Owner Name: Lenny's Gas N Wash Plano, LLC
Owner Address: 8200 185th Street
Tinley Park, IL 60487
Owner Status: Current Owner
Purchase Date: 9/16/2022
Type of Financial Responsibility: Designated Savings Account
Financial Responsibility Reporting Due Date: 12/27/2025

Motor Fuel Dispensing Permits

MFD Permit Type Issue Date Expiration Date
Self Service 4/27/2023 12/31/2025

Owner Summary

Click for Facility/Tank Ownership history
Owner Number Owner Name Owner Status Purchase Date
U0040614 Lenny's Gas N Wash Plano, LLC Current Owner 9/16/2022

Permits (Unexpired)

Click for permit history
Permit Number Type Status OSFM Receive Date Issue Date Expiration Date Documents
01565-2024UPG Upgrade Approved / Issued 12/5/2024 12/5/2024 6/5/2025 Documents

Notice of Violations (Current)

No Notice of Violations Found

IEMA Numbers Associated with the Facility

No IEMA Numbers Found

LUST Fund Eligibility and Deductibility Determinations

No Applications Found

Pay Tank Fees Online

Tank Information



Tank Number 1

Capacity: 6000 Petroleum Use: None
Product: Diesel Fuel CERCLA Substance:
Status: Currently in use CAS Code:
Regulated Status: Federal Removed Date:
OSFM First Notify Date: 4/4/2023 Abandoned Material:
Current Age: 2 Abandoned Date:
Install Date: 10/13/2022 Red Tag Issue Date:
Last Used Date: Fee Due: $0.00
Product Date:

Equipment

Equipment Type Equipment Last Passing Date Test Expire Date
Corrosion Prot - Piping Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Tank Composite Non-Corrosive N/A N/A
Leak Detect - Piping Electronic Pressurized Line Leak Detection 4/16/2024 4/16/2025
Leak Detect - Tank Automatic Tank Gauging Veeder Root TLS 450 Plus with CSLD 4/16/2024 4/16/2025
Leak Detect - Tank Non-Discriminating Interstitial Monitoring Sensors 4/16/2024 4/16/2025
Overfill Prev Device Overfill Drop Tube Valve 3/27/2023 3/27/2026
Piping Fiberglass Double Wall Ameron Dualoy 3000/LCX N/A N/A
Piping Single Wall STP/Tanktop Sump 11/22/2022 11/22/2025
Leak Detect - Piping Sump Sensor with positive shutdown 4/16/2024 4/16/2025
Spill Contain Device Double Wall Spill Bucket 11/22/2022 11/22/2025
Tank Composite Double Wall Modern Welding Glasteel II N/A N/A

Additional Tests

Equipment Type Equipment Test Type Test Result Test Date
Piping Fiberglass Double Wall Ameron Dualoy 3000/LCX Precision Test (Piping) Pass 4/16/2024
Tank Composite Double Wall Modern Welding Glasteel II Precision Test (Tank) Pass 4/26/2023



Tank Number 2

Capacity: 10000 Petroleum Use:
Product: E85 CERCLA Substance:
Status: Currently in use CAS Code:
Regulated Status: Federal Removed Date:
OSFM First Notify Date: 4/4/2023 Abandoned Material:
Current Age: 2 Abandoned Date:
Install Date: 10/13/2022 Red Tag Issue Date:
Last Used Date: Fee Due: $0.00
Product Date:

Equipment

Equipment Type Equipment Last Passing Date Test Expire Date
Corrosion Prot - Piping Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Tank Composite Non-Corrosive N/A N/A
Leak Detect - Piping Electronic Pressurized Line Leak Detection 4/16/2024 4/16/2025
Leak Detect - Tank Automatic Tank Gauging Veeder Root TLS 450 Plus with CSLD 4/16/2024 4/16/2025
Leak Detect - Tank Non-Discriminating Interstitial Monitoring Sensors 4/16/2024 4/16/2025
Overfill Prev Device Overfill Drop Tube Valve 3/27/2023 3/27/2026
Piping Fiberglass Double Wall Ameron Dualoy 3000/LCX N/A N/A
Piping Single Wall STP/Tanktop Sump 11/22/2022 11/22/2025
Leak Detect - Piping Sump Sensor with positive shutdown 4/16/2024 4/16/2025
Spill Contain Device Double Wall Spill Bucket 11/22/2022 11/22/2025
Tank Composite Double Wall Modern Welding Glasteel II N/A N/A

Additional Tests

Equipment Type Equipment Test Type Test Result Test Date
Piping Fiberglass Double Wall Ameron Dualoy 3000/LCX Precision Test (Piping) Pass 4/16/2024
Tank Composite Double Wall Modern Welding Glasteel II Precision Test (Tank) Pass 4/26/2023



Tank Number 3

Capacity: 6000 Petroleum Use:
Product: Gasoline - Premium CERCLA Substance:
Status: Currently in use CAS Code:
Regulated Status: Federal Removed Date:
OSFM First Notify Date: 4/4/2023 Abandoned Material:
Current Age: 2 Abandoned Date:
Install Date: 10/13/2022 Red Tag Issue Date:
Last Used Date: Fee Due: $0.00
Product Date:

Equipment

Equipment Type Equipment Last Passing Date Test Expire Date
Corrosion Prot - Piping Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Tank Composite Non-Corrosive N/A N/A
Leak Detect - Piping Electronic Pressurized Line Leak Detection 4/16/2024 4/16/2025
Leak Detect - Tank Automatic Tank Gauging Veeder Root TLS 450 Plus with CSLD 4/16/2024 4/16/2025
Leak Detect - Tank Non-Discriminating Interstitial Monitoring Sensors 4/16/2024 4/16/2025
Overfill Prev Device Overfill Drop Tube Valve 3/27/2023 3/27/2026
Piping Fiberglass Double Wall Ameron Dualoy 3000/LCX N/A N/A
Piping Single Wall STP/Tanktop Sump 11/22/2022 11/22/2025
Leak Detect - Piping Sump Sensor with positive shutdown 4/16/2024 4/16/2025
Spill Contain Device Double Wall Spill Bucket 11/22/2022 11/22/2025
Tank Composite Double Wall Modern Welding Glasteel II N/A N/A

Additional Tests

Equipment Type Equipment Test Type Test Result Test Date
Piping Fiberglass Double Wall Ameron Dualoy 3000/LCX Precision Test (Piping) Pass 4/16/2024
Tank Composite Double Wall Modern Welding Glasteel II Precision Test (Tank) Pass 4/26/2023



Tank Number 4

Capacity: 20000 Petroleum Use:
Product: Gasoline - Regular CERCLA Substance:
Status: Currently in use CAS Code:
Regulated Status: Federal Removed Date:
OSFM First Notify Date: 4/4/2023 Abandoned Material:
Current Age: 2 Abandoned Date:
Install Date: 10/13/2022 Red Tag Issue Date:
Last Used Date: Fee Due: $0.00
Product Date:

Equipment

Equipment Type Equipment Last Passing Date Test Expire Date
Corrosion Prot - Piping Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Tank Composite Non-Corrosive N/A N/A
Leak Detect - Piping Electronic Pressurized Line Leak Detection 4/16/2024 4/16/2025
Leak Detect - Tank Automatic Tank Gauging Veeder Root TLS 450 Plus with CSLD 4/16/2024 4/16/2025
Leak Detect - Tank Non-Discriminating Interstitial Monitoring Sensors 4/16/2024 4/16/2025
Overfill Prev Device Overfill Drop Tube Valve 3/27/2023 3/27/2026
Overfill Prev Device Overfill Drop Tube Valve 3/27/2023 3/27/2026
Piping Fiberglass Double Wall Ameron Dualoy 3000/LCX N/A N/A
Piping Single Wall STP/Tanktop Sump 11/22/2022 11/22/2025
Leak Detect - Piping Sump Sensor with positive shutdown 4/16/2024 4/16/2025
Spill Contain Device Double Wall Spill Bucket 11/22/2022 11/22/2025
Spill Contain Device Double Wall Spill Bucket 11/22/2022 11/22/2025
Tank Composite Double Wall Modern Welding Glasteel II N/A N/A

Additional Tests

Equipment Type Equipment Test Type Test Result Test Date
Piping Fiberglass Double Wall Ameron Dualoy 3000/LCX Precision Test (Piping) Pass 4/16/2024
Tank Composite Double Wall Modern Welding Glasteel II Precision Test (Tank) Pass 4/26/2023



Tank Number 5

Capacity: 12000 Petroleum Use: None
Product: Diesel Fuel CERCLA Substance:
Status: Currently in use CAS Code:
Regulated Status: Federal Removed Date:
OSFM First Notify Date: 4/4/2023 Abandoned Material:
Current Age: 2 Abandoned Date:
Install Date: 10/20/2022 Red Tag Issue Date:
Last Used Date: Fee Due: $0.00
Product Date:

Equipment

Equipment Type Equipment Last Passing Date Test Expire Date
Corrosion Prot - Piping Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Tank Composite Non-Corrosive N/A N/A
Leak Detect - Piping Electronic Pressurized Line Leak Detection 4/16/2024 4/16/2025
Leak Detect - Tank Automatic Tank Gauging Veeder Root TLS 450 Plus with CSLD 4/16/2024 4/16/2025
Leak Detect - Tank Non-Discriminating Interstitial Monitoring Sensors 4/16/2024 4/16/2025
Overfill Prev Device Overfill Drop Tube Valve 3/27/2023 3/27/2026
Piping Fiberglass Double Wall Ameron Dualoy 3000/LCX N/A N/A
Piping Single Wall STP/Tanktop Sump 12/7/2022 12/7/2025
Leak Detect - Piping Sump Sensor with positive shutdown 4/16/2024 4/16/2025
Spill Contain Device Double Wall Spill Bucket 12/7/2022 12/7/2025
Tank Composite Double Wall Modern Welding Glasteel II N/A N/A

Additional Tests

Equipment Type Equipment Test Type Test Result Test Date
Piping Fiberglass Double Wall Ameron Dualoy 3000/LCX Precision Test (Piping) Pass 4/16/2024
Tank Composite Double Wall Modern Welding Glasteel II Precision Test (Tank) Pass 4/26/2023

Dispenser Information



Name\ID 1/2

Status: Active
Equipment Type Equipment Last Passing Date Test Expire Date
Dispenser Single Wall UDC Sump 12/7/2022 12/7/2025
Leak Detect - Piping Sump Sensor with positive shutdown 4/16/2024 4/16/2025



Name\ID 11/12

Status: Active
Equipment Type Equipment Last Passing Date Test Expire Date
Dispenser Single Wall UDC Sump 12/7/2022 12/7/2025
Leak Detect - Piping Sump Sensor with positive shutdown 4/16/2024 4/16/2025



Name\ID 13/14

Status: Active
Equipment Type Equipment Last Passing Date Test Expire Date
Dispenser Single Wall UDC Sump 12/7/2022 12/7/2025
Leak Detect - Piping Sump Sensor with positive shutdown 4/16/2024 4/16/2025



Name\ID 15/16

Status: Active
Equipment Type Equipment Last Passing Date Test Expire Date
Dispenser Single Wall UDC Sump 12/7/2022 12/7/2025
Leak Detect - Piping Sump Sensor with positive shutdown 4/16/2024 4/16/2025



Name\ID 17 Sat

Status: Active
Equipment Type Equipment Last Passing Date Test Expire Date
Dispenser Single Wall UDC Sump 12/7/2022 12/7/2025
Leak Detect - Piping Sump Sensor with positive shutdown 4/16/2024 4/16/2025



Name\ID 17/18 Sat

Status: Active
Equipment Type Equipment Last Passing Date Test Expire Date
Dispenser Single Wall UDC Sump 12/7/2022 12/7/2025
Leak Detect - Piping Sump Sensor with positive shutdown 4/16/2024 4/16/2025



Name\ID 18/19 Sat

Status: Active
Equipment Type Equipment Last Passing Date Test Expire Date
Dispenser Single Wall UDC Sump 12/7/2022 12/7/2025
Leak Detect - Piping Sump Sensor with positive shutdown 4/16/2024 4/16/2025



Name\ID 19/20 Sat

Status: Active
Equipment Type Equipment Last Passing Date Test Expire Date
Dispenser Single Wall UDC Sump 12/7/2022 12/7/2025
Leak Detect - Piping Sump Sensor with positive shutdown 4/16/2024 4/16/2025



Name\ID 20

Status: Active
Equipment Type Equipment Last Passing Date Test Expire Date
Dispenser Single Wall UDC Sump 12/7/2022 12/7/2025
Leak Detect - Piping Sump Sensor with positive shutdown 4/16/2024 4/16/2025



Name\ID 3/4

Status: Active
Equipment Type Equipment Last Passing Date Test Expire Date
Dispenser Not Installed UDC Sump N/A N/A
Leak Detect - Piping Sump Sensor with positive shutdown 4/16/2024 4/16/2025



Name\ID 5/6

Status: Active
Equipment Type Equipment Last Passing Date Test Expire Date
Dispenser Single Wall UDC Sump 12/7/2022 12/7/2025
Leak Detect - Piping Sump Sensor with positive shutdown 4/16/2024 4/16/2025



Name\ID 7/8

Status: Active
Equipment Type Equipment Last Passing Date Test Expire Date
Dispenser Single Wall UDC Sump 12/7/2022 12/7/2025
Leak Detect - Piping Sump Sensor with positive shutdown 4/16/2024 4/16/2025



Name\ID 9/10

Status: Active
Equipment Type Equipment Last Passing Date Test Expire Date
Dispenser Single Wall UDC Sump 12/7/2022 12/7/2025
Leak Detect - Piping Sump Sensor with positive shutdown 4/16/2024 4/16/2025

MFD Motorfuel Dispensing Forms

Facility Number Name City Received Date Letter
2047459 Lenny's Gas N Wash Plano LLC Plano 08/30/2022 Letter Form