Notice of Violatlions (Current)
NOV Number:
E0020261165
(Pending)
Issue Date:
5/4/2026
Expiration Date:
7/3/2026
View NOV Form
| Tanks |
Violations |
| 4 |
Open electrical conduit or junction boxes. - Red wire coming out of the Junction box within the STP |
| 4, 6 |
Precision line test required. - This is required before the Diesel Pumps are reopened. Must have a passing test. This is required based on the incident last week of the functional element failing on the top of the submersible pump. |