| 4 |
Containment support components are cracked, deteriorated or missing. The cover and supporting components that are defective shall be replaced with factory manufactured components. - Section 175.410 Submersible, Under-dispenser, Transition and Other Containment Sumps
a) All containment sumps must consist of a factory manufactured containment that is liquid-tight on its sides, bottom and at any penetrations and is compatible with the substance conveyed by the piping. Such containment shall also have a factory manufactured protective cover and supporting components that are properly maintained. If the protective cover or its supporting components are cracked, deteriorated, or missing, the cover and supporting components that are defective shall be replaced. SPECIFICALLY THE DIESEL STP LIDS WITH SAFETY CONE OVER IT. |
| 1 |
Open electrical conduit or junction boxes. - JUNCTION BOX AT ATG MANWAY HAS BROKEN CAP WITH EXPOSED WIRING. REPLACE JUNCTION BOX. |
| 1, 2, 3, 4 |
Required monthly tank leak test records not available. - NEW OWNER EFFECTIVE 1/23/2026. FEB MONTHLY MISSING PASS ON PREM TANK. Maintain one PASSing report per TANK, per month, from ATG. Must maintain 24 months’ . |
| 1, 2, 3, 4 |
Tank monitor does not appear to function properly and requires maintenance. - Indicator lights on panel of Veeder-Root ATG are not functional. Replace all 3 lights as necessary to provide proper operation. |