| 5 |
Install or replace lockable fill pipe caps. - Regular fill cap is broke and needs repaired/replaced. |
| 6, 7 |
Miscellaneous - Equipment in disrepair 176.410 |
| Facility |
Missing copies of 30 day Walkthrough Inspection Report. - 30-day Walkthrough Inspection shall be completed, and documentation maintained on site. 30-Day Walkthrough Inspection form available at https://sfm.illinois.gov/content/dam/soi/en/web/sfm/sfmdocuments/documents/30-day-walkthrough-inspection-report.pdf |
| 5, 6, 7 |
Monthly line interstitial sensor records not available. - Maintain one NORMAL report per LINE, per month, from ATG. (Liquid Status) |
| 5, 6, 7 |
Precision tank test required. - Due to missing monthly tapes. (All tanks) |
| 5, 6, 7 |
Required monthly tank interstitial sensor records not available. - Maintain one NORMAL report per TANK, per month, from ATG. (Liquid Status) |
| 5, 6, 7 |
Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry. |
| 5, 6, 7 |
Water in containment with required interstitial sensors - Remove water and repair containments to prevent water ingress. - Dispenser 3/4 has water. |