Notice of Violatlions (Current)
NOV Number:
E0020261243
(Pending)
Issue Date:
5/11/2026
Expiration Date:
7/10/2026
View NOV Form
| Tanks |
Violations |
| 8 |
Line leak detection equipment in alarm or failed test, must repair or replace. - Arrived at site for station fuel system audit and found all pumps bagged and sign stating "FUEL PUMPS DOWN" spoke with attendent and asked to see tank monitor. Found Premium tank had a shut down alarm and leak detector had failed testing shutting down premium tank #8. Repair must be made and if piping related must pass a line test. |
| 8 |
Precision line test required. - If line has failed and not an electronics issue. |