| Facility |
A/B operator retraining required as a result of issuance of the Notice of Violation and must be completed within 30 days. - https://www2.illinois.gov/sites/sfm/About/Divisions/Petroleum-Chemical-Safety/Pages/Applications-and-Forms.aspx |
| Facility |
Facility Operation and Maintenance Plan not completed or available. - https://www2.illinois.gov/sites/sfm/About/Divisions/Petroleum-Chemical-Safety/Pages/Applications-and-Forms.aspx |
| Facility |
Missing copies of 30 day Walkthrough Inspection Report. - https://www2.illinois.gov/sites/sfm/About/Divisions/Petroleum-Chemical-Safety/Pages/Applications-and-Forms.aspx |
| Facility |
Missing copies of current testing certificates for operator training - https://www2.illinois.gov/sites/sfm/About/Divisions/Petroleum-Chemical-Safety/Pages/Applications-and-Forms.aspx |
| Facility |
Missing copy of emergency instructions or emergency procedures plan - https://www2.illinois.gov/sites/sfm/About/Divisions/Petroleum-Chemical-Safety/Pages/Applications-and-Forms.aspx |
| Facility |
Missing list of designated Class A/B & C Operators - https://www2.illinois.gov/sites/sfm/About/Divisions/Petroleum-Chemical-Safety/Pages/Applications-and-Forms.aspx |
| 7, 8, 9 |
Precision tank test required. - If cannot provide 2 years of passing tank monitor tapes. |
| 7, 8, 9 |
Required monthly tank leak test records not available. |
| 7, 8, 9 |
Tank monitor does not appear to function properly and requires maintenance. - Incorrect dates on monitor and tapes. |