Facility |
A/B operator retraining required as a result of issuance of the Notice of Violation - Primary A / B certified operator (BRIJESHKMAR PATEL) shall be retrained as a result of this NOV being issued. |
Facility |
Annual Emergency Stop Inspection not completed or inspection report not available. - All emergency shutoff switches shall be tested annually to verify they shut down all STPs or dispensers. Perform test, complete form (form is available at www.sfm.illinois.gov) and maintain 2 years on site with other annual testing documentation. |
5, 7 |
Containment support components are cracked, deteriorated or missing. The cover and supporting components that are defective shall be replaced with factory manufactured components. - Section 175.410 Submersible, Under-dispenser, Transition and Other Containment Sumps
a) All containment sumps must consist of a factory manufactured containment that is liquid-tight on its sides, bottom and at any penetrations and is compatible with the substance conveyed by the piping. Such containment shall also have a factory manufactured protective cover and supporting components that are properly maintained. If the protective cover or its supporting components are cracked, deteriorated or missing, the cover and supporting components that are defective shall be replaced. SPECIFICALLY TANK 5 PREMIUM MISSING HANDLE AND TANK 7 DIESEL HYDRAULICS NOT FUNCTIONING. |
Facility |
Facility Operation and Maintenance Plan not completed or available. - Facility Operations and Maintenance Plan does not meet requirements of new rules. Go to www.sfm.illinois.gov to download and complete O & M template and maintain completed form on site. |
Facility |
Missing copies of 30 day Walkthrough Inspection Report. - 30-day Walkthrough Inspection shall be completed, and 2 years of documentation maintained on site. 30-Day Walkthrough Inspection form available at www.sfm.illinois.gov. The form must be filled out by an A/B Operator, you must, initial each box that applies, date the form each month to ensure it is being done every 30 days, and the A/B operator must print and sign their name at the bottom. If more than one A/B operator fills out the form, then each must print and sign name at the bottom. |
Facility |
Missing copies of Annual Walkthrough Inspection Report. - Annual Walkthrough by a licensed contractor shall be conducted and 2 years documentation maintained on site. |
Facility |
Missing copies of current testing certificates for operator training - Copies of all current Class C testing certificates shall be maintained on file on site.
Go to www.sfm.illinois.gov (UST Operator Training) to find current information regarding Operator
Training requirements, including all relevant forms. |
Facility |
Missing copy of emergency instructions or emergency procedures plan - Emergency Procedures plan shall be maintained on site for viewing and reference as necessary (See Operator Training Rules 176.645). The emergency plan template is available on the OSFM website. |
Facility |
Missing list of designated Class A/B & C Operators - A comprehensive list of Class A / B / C Operator(s) shall be maintained on site and must be current. |
5, 6, 7 |
Monthly impressed current system log not available or maintained. - A log showing the rectifier gauge readings from Impressed Current rectifier shall be maintained monthly on site for review by OSFM Inspector. Log shall show date; amp, volt, indicator lights functionality, and hour meter readings; system status, name of employee who recorded information. NEED TO SEE YEARS WORTH. |
5, 6, 7 |
Precision tank test required. - Precision tank test is required on tanks if you cannot provide 24 months’ worth of tank “PASS” from ATG. |
5, 6, 7 |
Required monthly tank leak test records not available. - Maintain one PASSing report per TANK, per month, from ATG. Must maintain 24 months’ worth. |
5, 6, 7 |
Shear valve inspection report not completed (Required during Annual Walkthrough Inspection). - Provide documentation that annual testing of all shear valves has been conducted and passed. Must maintain 2 years of inspection reports. |
5, 6, 7 |
Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry. |