7, 8 |
Annual leak detection certification not completed (Required annually). |
7, 8 |
Annual line precision and mechanical line leak detector functional test not completed. |
7, 8 |
Dispensers - hoses cracked, split or worn and require replacement |
Facility |
Financial responsibility must be reported yearly |
7, 8 |
Line interstitial sensor functional test not accomplished (Required annually). |
7 |
Line leak detection equipment in alarm or failed test, must repair or replace. |
Facility |
Missing copies of Annual Walkthrough Inspection Report. |
Facility |
Missing copy of emergency instructions or emergency procedures plan |
7, 8 |
Overfill prevention equipment inspection(s) not completed (Required every 3 years). - LAST TESTED 12-16-21 |
7, 8 |
Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry. |
7, 8 |
Tank interstitial sensor functional test not accomplished (Required annually). |
7, 8 |
Tank monitor does not appear to function properly and requires maintenance. - IN ALARM |
7, 8 |
Triennial spill prevention equipment testing not completed. - LAST TESTED 12-16-21 |
7, 8 |
Triennial testing for qualifying piping containment sump not completed (Required every 3 years). - STP and DISPENSER PANS |
7 |
Water in containment with required interstitial sensors - Remove water and repair containments to prevent water ingress. - REGULAR GAS STP IS FULL OF WATER . PLEASE HAVE IT REPAIRED AND KEEP DRY |