Division of Petroleum & Chemical Safety

 

Facility Details

Facility Number: 2015090
Status: Active
Facility Name: Sprint Switch Site
Address: 4200 West 40th Street Chicago, IL 60632
County: Cook
Property Parcel: 19-03-200-026-0000
Facility Type: Utility
Owner Type: Private
Green Tag Decal: Y003541
Green Tag Issue Date: 8/15/2023
Green Tag Expiration Date: 12/31/2025

Owner Details

Owner Name: US Sprint Communications Company LP
Owner Address: 2450 N Street NW Washington, DC 20037
Owner Status: Current Owner
Purchase Date: 1/3/1989
Type of Financial Responsibility: Commercial Insurance
Financial Responsibility Reporting Due Date: 9/9/2026

Motor Fuel Dispensing Permits

No MFD Permits Found

Owner Summary

Click for Facility/Tank Ownership history
Owner Number Owner Name Owner Status Purchase Date
U0015548 US Sprint Communications Company LP Current Owner 1/3/1989
U0015552 Us Telecom Former Owner 12/31/1967

Permits (Unexpired)

Click for permit history

No Active Permits Found

Notice of Violatlions (Current)

NOV Number: E0020252568 (Pending)    Issue Date: 9/29/2025    Expiration Date: 11/28/2025    View NOV Form

Tanks Violations
1, 2 Triennial testing for qualifying piping containment sump not completed (Required every 3 years).

IEMA Numbers Associated with the Facility

No IEMA Numbers Found

LUST Fund Eligibility and Deductibility Determinations

No Applications Found

Pay Tank Fees Online

Tank Information



Tank Number 1

Capacity: 6000 Petroleum Use:
Product: Diesel Fuel CERCLA Substance:
Status: Currently in use CAS Code:
Regulated Status: Federal Removed Date:
OSFM First Notify Date: 5/21/1986 Abandoned Material:
Current Age: 40 Abandoned Date:
Install Date: 8/1/1985 Red Tag Issue Date:
Last Used Date: Fee Due: $0.00
Product Date: 8/1/1985

Equipment

Equipment Type Equipment Last Passing Date Test Expire Date
Corrosion Prot - Piping Flexible Non-Corrosive N/A N/A
Corrosion Prot - Tank Fiberglass Non-Corrosive N/A N/A
Leak Detect - Piping European with No Test Req Suction N/A N/A
Leak Detect - Tank Automatic Tank Gauging Veeder Root TLS 300c 4/11/2025 4/11/2026
Overfill Prev Device Overfill Alarm 4/16/2024 4/16/2027
Overfill Prev Device Overfill Drop Tube Valve 4/16/2024 4/16/2027
Piping Flexible Double Wall A.P.T. Poly Tech N/A N/A
Piping Single Wall STP/Tanktop Sump 4/15/2021 4/15/2024
Leak Detect - Piping Sump Sensor 4/11/2025 4/11/2026
Spill Contain Device Double Wall Spill Bucket 4/16/2024 4/16/2027
Tank Fiberglass Double Wall N/A N/A

Additional Tests

Equipment Type Equipment Test Type Test Result Test Date
Piping Flexible Double Wall A.P.T. Poly Tech Precision Test (Piping) Pass 4/14/2025
Tank Fiberglass Double Wall Precision Test (Tank) Pass 4/14/2025



Tank Number 2

Capacity: 6000 Petroleum Use: Back-up Generator
Product: Diesel Fuel CERCLA Substance:
Status: Currently in use CAS Code:
Regulated Status: Federal Removed Date:
OSFM First Notify Date: 2/26/2002 Abandoned Material:
Current Age: 26 Abandoned Date:
Install Date: 12/1/1998 Red Tag Issue Date:
Last Used Date: Fee Due: $0.00
Product Date:

Equipment

Equipment Type Equipment Last Passing Date Test Expire Date
Corrosion Prot - Piping Flexible Non-Corrosive N/A N/A
Corrosion Prot - Tank Fiberglass Non-Corrosive N/A N/A
Leak Detect - Piping European with No Test Req Suction N/A N/A
Leak Detect - Tank Automatic Tank Gauging Veeder Root TLS 300c 4/11/2025 4/11/2026
Leak Detect - Tank Non-Discriminating Interstitial Monitoring Sensors 4/11/2025 4/11/2026
Overfill Prev Device Overfill Alarm 4/16/2024 4/16/2027
Overfill Prev Device Overfill Drop Tube Valve 4/16/2024 4/16/2027
Piping Flexible Double Wall A.P.T. Poly Tech N/A N/A
Piping Single Wall STP/Tanktop Sump 4/15/2021 4/15/2024
Leak Detect - Piping Sump Sensor 4/11/2025 4/11/2026
Spill Contain Device Single Wall Spill Bucket 4/16/2024 4/16/2027
Tank Fiberglass Double Wall N/A N/A

Additional Tests

Equipment Type Equipment Test Type Test Result Test Date
Piping Flexible Double Wall A.P.T. Poly Tech Precision Test (Piping) Pass 4/14/2025
Tank Fiberglass Double Wall Precision Test (Tank) Pass 4/14/2025



Tank Number 3

Capacity: 6000 Petroleum Use: Back-up Generator
Product: Diesel Fuel CERCLA Substance:
Status: Currently in use CAS Code:
Regulated Status: Federal Removed Date:
OSFM First Notify Date: 11/1/2002 Abandoned Material:
Current Age: 23 Abandoned Date:
Install Date: 7/15/2002 Red Tag Issue Date:
Last Used Date: Fee Due: $0.00
Product Date: 7/15/2002

Equipment

Equipment Type Equipment Last Passing Date Test Expire Date
Corrosion Prot - Piping Flexible Non-Corrosive N/A N/A
Corrosion Prot - Tank Fiberglass Non-Corrosive N/A N/A
Leak Detect - Piping European with No Test Req Suction N/A N/A
Leak Detect - Tank Automatic Tank Gauging Veeder Root TLS 300c 4/11/2025 4/11/2026
Leak Detect - Tank Non-Discriminating Interstitial Monitoring Sensors 4/11/2025 4/11/2026
Overfill Prev Device Overfill Alarm 4/16/2024 4/16/2027
Overfill Prev Device Overfill Drop Tube Valve 4/16/2024 4/16/2027
Piping Flexible Double Wall A.P.T. Poly Tech N/A N/A
Piping Single Wall STP/Tanktop Sump 4/16/2024 4/16/2027
Leak Detect - Piping Sump Sensor 4/11/2025 4/11/2026
Spill Contain Device Single Wall Spill Bucket 4/16/2024 4/16/2027
Tank Fiberglass Double Wall N/A N/A

Additional Tests

Equipment Type Equipment Test Type Test Result Test Date
Piping Flexible Double Wall A.P.T. Poly Tech Precision Test (Piping) Pass 4/14/2025
Tank Fiberglass Double Wall Precision Test (Tank) Pass 4/14/2025



Tank Number 4

Capacity: 6000 Petroleum Use: Back-up Generator
Product: Diesel Fuel CERCLA Substance:
Status: Currently in use CAS Code:
Regulated Status: Federal Removed Date:
OSFM First Notify Date: 11/19/2007 Abandoned Material:
Current Age: 18 Abandoned Date:
Install Date: 10/27/2006 Red Tag Issue Date:
Last Used Date: Fee Due:
Product Date: 12/14/2006

Equipment

Equipment Type Equipment Last Passing Date Test Expire Date
Corrosion Prot - Piping Flexible Non-Corrosive N/A N/A
Corrosion Prot - Tank Fiberglass Non-Corrosive N/A N/A
Leak Detect - Piping Electronic Pressurized Line Leak Detection 4/14/2025 4/14/2026
Leak Detect - Piping Electronic Pressurized Line Leak Detection 4/14/2025 4/14/2026
Leak Detect - Tank Automatic Tank Gauging Veeder Root TLS 300c 4/11/2025 4/11/2026
Leak Detect - Tank Non-Discriminating Interstitial Monitoring Sensors 4/11/2025 4/11/2026
Overfill Prev Device Overfill Alarm 4/16/2024 4/16/2027
Overfill Prev Device Overfill Drop Tube Valve 4/16/2024 4/16/2027
Piping Flexible Double Wall A.P.T. Poly Tech N/A N/A
Piping Single Wall STP/Tanktop Sump 4/16/2024 4/16/2027
Leak Detect - Piping Sump Sensor 4/11/2025 4/11/2026
Spill Contain Device Single Wall Spill Bucket 4/16/2024 4/16/2027
Tank Fiberglass Double Wall N/A N/A

Additional Tests

Equipment Type Equipment Test Type Test Result Test Date
Piping Flexible Double Wall A.P.T. Poly Tech Precision Test (Piping) Pass 4/14/2025
Tank Fiberglass Double Wall Precision Test (Tank) Pass 4/14/2025



Tank Number 5

Capacity: 8000 Petroleum Use: Back-up Generator
Product: Diesel Fuel CERCLA Substance:
Status: Currently in use CAS Code:
Regulated Status: Federal Removed Date:
OSFM First Notify Date: 11/19/2007 Abandoned Material:
Current Age: 18 Abandoned Date:
Install Date: 10/27/2006 Red Tag Issue Date:
Last Used Date: Fee Due:
Product Date: 12/14/2006

Equipment

Equipment Type Equipment Last Passing Date Test Expire Date
Corrosion Prot - Piping Flexible Non-Corrosive N/A N/A
Corrosion Prot - Tank Fiberglass Non-Corrosive N/A N/A
Leak Detect - Piping Electronic Pressurized Line Leak Detection 4/14/2025 4/14/2026
Leak Detect - Piping Electronic Pressurized Line Leak Detection 4/14/2025 4/14/2026
Leak Detect - Tank Automatic Tank Gauging Veeder Root TLS 300c 4/11/2025 4/11/2026
Leak Detect - Tank Non-Discriminating Interstitial Monitoring Sensors 4/11/2025 4/11/2026
Overfill Prev Device Overfill Alarm 4/16/2024 4/16/2027
Overfill Prev Device Overfill Drop Tube Valve 4/16/2024 4/16/2027
Piping Flexible Double Wall A.P.T. Poly Tech N/A N/A
Piping Single Wall STP/Tanktop Sump 4/16/2024 4/16/2027
Leak Detect - Piping Sump Sensor 4/11/2025 4/11/2026
Spill Contain Device Single Wall Spill Bucket 4/16/2024 4/16/2027
Tank Fiberglass Double Wall N/A N/A

Additional Tests

Equipment Type Equipment Test Type Test Result Test Date
Piping Flexible Double Wall A.P.T. Poly Tech Precision Test (Piping) Pass 4/14/2025
Tank Fiberglass Double Wall Precision Test (Tank) Pass 4/14/2025

Dispenser Information



MFD Motorfuel Dispensing Forms

No Forms Found