| 10, 11, 12, 13 |
Dispensers - hoses cracked, split or worn and require replacement |
| Facility |
Missing copies of 30 day Walkthrough Inspection Report. - 30-day Walkthrough Inspection shall be completed, and documentation maintained on site. 30-Day Walkthrough Inspection form available at www.sfm.illinois.gov. The form must be filled out by an A/B Operator, you must, initial each box that applies, date the form each month to ensure it is being done every 30 days, and the A/B operator must print and sign their name at the bottom. If more than one A/B operator fills out the form, then each must print and sign name at the bottom. |
| Facility |
Missing copy of written UST facility operation & maintenance plan - Adopt and implement a written operations and maintenance plan, signed by both the owner and either a Class A or Class B Operator designated for the UST facility An Operations & Maintenance template is available at www.sfm.illinois.gov to download and complete O & M template and maintain completed form on site. |
| 10, 11, 12, 13 |
Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry. |