| 1, 2, 3, 4, 12 |
Monthly impressed current log not available or maintained. - Impressed Current rectifier readings shall be maintained on 30-Day Inspection report. |
| 1, 2, 3, 4, 12 |
Precision tank test required. - Maintain one PASSing report per TANK, per month, from ATG. |
| 1, 2, 3, 4, 12 |
Required monthly tank leak test records not available. - Maintain one PASSing report per TANK, per month, from ATG. Must maintain 24 months’ worth. |
| 1, 2, 3, 4, 12 |
Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry. - Remove Liquid |