Line interstitial sensors have been raised and rendered inoperational. - Dispenser 17.
175.640 a) 2) All new and existing sump sensors must be installed so as to detect liquid per manufacturer's specifications or, if not specified by the manufacturer, at the lowest point in the sump. |
| Facility |
Miscellaneous - Emergency shut off at truck side needs to be marked. There is a sign above switch (approximately 24"), but switch blends in and is hard to see. Switch shall be conspicuously marked. Paint switch box red or somehow so people know that is the shut off switch. |
| 4 |
Open electrical conduit or junction boxes. - Junction box is open in probe well. All electric needs to be sealed. |
| 3, 4, 5, 6 |
Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry. - 175.405 a) 1) A) Spill containment equipment that will prevent release of product to
the environment when the transfer hose is detached from the fill
pipe (e.g., a spill catch basin). Spill containment equipment shall
be maintained in a dry, clean state. |