Notice of Violatlions (Current)
NOV Number:
E0020251662
(Pending)
Issue Date:
7/2/2025
Expiration Date:
8/31/2025
View NOV Form
Tanks |
Violations |
Facility |
Facility Operation and Maintenance Plan not completed or available. - Go to https://sfm.illinois.gov/content/dam/soi/en/web/sfm/sfmdocuments/documents/oandmtemplate.pdf to download and complete O & M template and maintain completed form on site. |
Facility |
Missing copy of emergency instructions or emergency procedures plan - Form can be found at https://sfm.illinois.gov to download and complete. |
Facility |
Missing list of designated Class A/B & C Operators - Form can be found at https://sfm.illinois.gov to download and complete. |
4, 5, 6 |
Piping interstitial must be open in all sumps - Need to open the ball valves for the Double wall piping. (All STP's and Disp. 1/2) |
4, 5, 6 |
Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry. |
NOV Number:
E0020251663
(Pending)
Issue Date:
7/2/2025
Expiration Date:
8/31/2025
View NOV Form
Tanks |
Violations |
Facility |
LP gas storage lacks proper collision protection or a 40" measurement from cabinet to a 5" raised sidewalk - Need to have collision protection or move the LP Gas cage. |