| Facility |
A/B operator retraining required as a result of issuance of the Notice of Violation and must be completed within 30 days. |
| Facility |
Annual Emergency Stop Inspection not completed or inspection report not available. |
| Facility |
Facility Operation and Maintenance Plan not completed or available. - This can be found on the firemarshal website, if you need help finding it, call the inspector |
| Facility |
Financial responsibility must be reported yearly |
| 4 |
Line interstitial sensors have been raised and rendered inoperational. - Premium stp sensor must be mounted vertically not on an angle |
| 4 |
Miscellaneous - The steel cover protecting the vent is cracked and missing a section exposing the inside to rain which would fill up the containment. Replace lid |
| Facility |
Missing copies of 30 day Walkthrough Inspection Report. - This can be found on the firemarshal website, if you need help finding it, call the inspector |
| Facility |
Missing copies of Annual Walkthrough Inspection Report. |
| 1, 2, 3, 4 |
Monthly line interstitial sensor records not available. |
| 1, 2, 3, 4 |
Piping interstitial must be open in all sumps - WHITHN STP'S AND DISPENSER SUMPS. Have contractor call inspector when on jobsite to complete this |
| 1, 2, 3, 4 |
Precision tank test required. - If the above and below records can not be produced for the past 2 years (one passing per month) this MUST BE COMPLETED. |
| 1, 2, 3, 4 |
Required monthly tank interstitial sensor records not available. |
| 1, 2, 3, 4 |
Required monthly tank leak test records not available. |
| 1, 2, 3, 4 |
Shear valve inspection report not completed (Required during Annual Walkthrough Inspection). |
| 1, 2, 3, 4 |
Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry. |