| 3 |
Dispensers - hoses cracked, split or worn and require replacement - No Ethanol hose is cracked in several places. |
| Facility |
Facility Operation and Maintenance Plan not completed or available. - Adopt and implement a written operations and maintenance plan, signed by both the owner and either a Class A or Class B Operator designated for the UST facility An Operations & Maintenance template is available on the OSFM website. https://sfm.illinois.gov/about/divisions/petroleum-chemical-safety/applications-and-forms.html |
| Facility |
Financial responsibility must be reported yearly - Financial Responsibility must be declared annually. The form can be found at https://webapps.sfm.illinois.gov/USTPortal/Forms/FinancialResponsibility. |
| Facility |
Missing copies of 30 day Walkthrough Inspection Report. - 30-day Walkthrough Inspection shall be completed, and documentation maintained on site. 30-Day Walkthrough Inspection form available at https://sfm.illinois.gov/about/divisions/petroleum-chemical-safety/applications-and-forms.html |
| Facility |
Missing copies of current testing certificates for operator training - Copies of all current Class A/B testing certificates shall be maintained on file on site.
Copies of all current Class C testing certificates shall be maintained on file on site. |
| Facility |
Missing copy of emergency instructions or emergency procedures plan - Emergency Procedures plan shall be maintained on site for viewing and reference as necessary (See Operator Training Rules 176.645). The emergency plan template is available on the OSFM website.
https://sfm.illinois.gov/about/divisions/petroleum-chemical-safety/applications-and-forms.html |
| Facility |
Missing list of designated Class A/B & C Operators - Go to www.sfm.illinois.gov (UST Operator Training) to find current information regarding Operator.
Training requirements, including all relevant forms. |
| 1, 2, 3, 4 |
Monthly line interstitial sensor records not available. - Maintain one NORMAL report per LINE, per month, from ATG. |
| 1, 2, 3, 4 |
Required monthly tank leak test records not available. - Maintain one PASSING report per TANK, per month, from ATG. |
| 1, 2, 3, 4 |
Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry. |
| Facility |
Submit Notification Form For Ownership Change - 41 IAC 175.200 (e) The Notification Form is available at https://webapps.sfm.illinois.gov/USTPortal/NotificationForm. This form is required to be submitted within 30 days of an ownership change. |