Division of Petroleum & Chemical Safety

 

Facility: 2041686 Tank: 1

Click for Facility/Tank Ownership history

Capacity: 20000
Product: Gasoline - Regular
Status: Currently in use
Regulated Status Federal
OSFM First Notify Date: 4/5/2004
Current Age: 20
Install Date: 11/6/2003
Last Used Date:
Product Date: 2/26/2004
Petroleum Use:
CERCLA Substance:
CAS Code:
Removed Date:
Abandoned Material:
Abandoned Date:
Red Tag Issue Date:
Fee Due: $0.00
UL Number

Equipment Information

Equipment Type Equipment Install Date Last Passing Test Date Test Expire Date Failed Test Date
Corrosion Prot - Piping Flexible Non-Corrosive 11/3/2003 N/A N/A
Corrosion Prot - Tank Fiberglass Non-Corrosive 11/3/2003 N/A N/A
Leak Detect - Piping Electronic Pressurized Line Leak Detection North 11/3/2003 3/6/2024 3/6/2025
Leak Detect - Piping Electronic Pressurized Line Leak Detection South 10/26/2020 3/6/2024 3/6/2025
Leak Detect - Tank Automatic Tank Gauging Veeder Root TLS 350 with CSLD 11/3/2003 3/6/2024 3/6/2025
Leak Detect - Tank Hydrostatic Reservoir Interstitial Monitoring Sensors 4/12/2019 3/6/2024 3/6/2025
Overfill Prev Device Overfill Drop Tube Valve 10/27/2022 10/27/2025
Piping Flexible Double Wall Environ Geo Flex 11/3/2003 N/A N/A
Piping Single Wall STP/Tanktop Sump 8/9/2021 8/9/2024
Leak Detect - Piping Sump Sensor 11/3/2003 3/6/2024 3/6/2025
Piping Single Wall Transition Sump 11/12 8/9/2021 8/9/2024
Leak Detect - Piping Sump Sensor 3/6/2024 3/6/2025
Piping Single Wall Transition Sump 17/18 South West 8/9/2021 8/9/2024
Leak Detect - Piping Sump Sensor 3/6/2024 3/6/2025
Piping Single Wall Transition Sump 5/6 8/9/2021 8/9/2024
Leak Detect - Piping Sump Sensor 3/6/2024 3/6/2025
Piping Single Wall Transition Sump 7/8 8/9/2021 8/9/2024
Leak Detect - Piping Sump Sensor 3/6/2024 3/6/2025
Piping Single Wall Transition Sump 13/14 8/9/2021 8/9/2024
Leak Detect - Piping Sump Sensor 3/6/2024 3/6/2025
Piping Single Wall Transition Sump 9/10 8/9/2021 8/9/2024
Leak Detect - Piping Sump Sensor 3/6/2024 3/6/2025
Piping Single Wall Transition Sump 19/20 South East 8/9/2021 8/9/2024
Leak Detect - Piping Sump Sensor 3/6/2024 3/6/2025
Piping Single Wall Transition Sump 3/4 North East 8/9/2021 8/9/2024
Leak Detect - Piping Sump Sensor 3/6/2024 3/6/2025
Piping Single Wall Transition Sump 1/2 North West 8/9/2021 8/9/2024
Leak Detect - Piping Sump Sensor 3/6/2024 3/6/2025
Piping Single Wall Transition Sump 15/16 8/9/2021 8/9/2024
Leak Detect - Piping Sump Sensor 3/6/2024 3/6/2025
Spill Contain Device Single Wall Spill Bucket 4/5/2019 8/9/2021 8/9/2024
Tank Fiberglass Brine Filled Double Wall Containment Solutions 11/3/2003 N/A N/A

Latest Blended Fuel Compatibility Form

No Compatibility Forms Listed


Additional Tests

No Additional Tests Listed