Division of Petroleum & Chemical Safety

 

Facility: 2044742 Tank: 5

Click for Facility/Tank Ownership history

Capacity: 1500
Product: Ultrazol - Fuel Additive
Status: Currently in use
Regulated Status Federal
OSFM First Notify Date: 9/26/2011
Current Age: 12
Install Date: 8/24/2011
Last Used Date:
Product Date: 9/14/2011
Petroleum Use:
CERCLA Substance:
CAS Code:
Removed Date:
Abandoned Material:
Abandoned Date:
Red Tag Issue Date:
Fee Due: $0.00
UL Number

Equipment Information

Equipment Type Equipment Install Date Last Passing Test Date Test Expire Date Failed Test Date
Corrosion Prot - Piping Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Tank Fiberglass Non-Corrosive N/A N/A
Leak Detect - Piping Mechanical Pressurized Line Leak Detection 3/18/2024 3/18/2025
Leak Detect - Tank Automatic Tank Gauging Veeder Root TLS 350R 3/18/2024 3/18/2025
Leak Detect - Tank Non-Discriminating Interstitial Monitoring Sensors 3/18/2024 3/18/2025
Overfill Prev Device Overfill Alarm 4/21/2020 4/27/2022 4/27/2025
Overfill Prev Device Overfill Drop Tube Valve 4/27/2022 4/27/2025
Piping Fiberglass Double Wall Ameron Dualoy 3000/LCX N/A N/A
Piping Fiberglass Double Wall A.O. Smith N/A N/A
Piping Single Wall STP/Tanktop Sump 6/10/2021 6/10/2024
Leak Detect - Piping Sump Sensor with positive shutdown 3/18/2024 3/18/2025
Piping Single Wall Transition Sump Additive Tank#2 Fill 6/10/2021 6/10/2024
Leak Detect - Piping Sump Sensor with positive shutdown 3/18/2024 3/18/2025
Piping Single Wall Transition Sump Additive Tank#1 Fill 6/10/2021 6/10/2024
Leak Detect - Piping Sump Sensor with positive shutdown 3/18/2024 3/18/2025
Piping Single Wall Transition Sump Additive Tank#3 Fill 6/10/2021 6/10/2024
Leak Detect - Piping Sump Sensor with positive shutdown 3/18/2024 3/18/2025
Spill Contain Device Single Wall Spill Bucket 6/10/2021 6/10/2024
Tank Fiberglass Brine Filled Double Wall Containment Solutions N/A N/A

Latest Blended Fuel Compatibility Form

No Compatibility Forms Listed


Additional Tests

Equipment Type Equipment Test Type Test Result Test Date History
Piping Fiberglass Double Wall A.O. Smith Precision Test Pass 3/18/2024 Show History
Piping Fiberglass Double Wall Ameron Dualoy 3000/LCX Precision Test Pass 4/12/2023 Show History