Information
JB Pritzker, Governor
James A. Rivera, State Fire Marshal
Division of Petroleum & Chemical Safety
State of Illinois
Employment Opportunities
Ready Illinois
Find us on Facebook
UST
Search
Contractor Search
Permit Search
Disclaimer & Rules/Statutes
Disclaimer
Rules
Statutes
Statistics & Reports
Statistics
Red Tag Tanks
Blended Fuel Tanks
Federal Energy Act Reports
Help
Division of Petroleum & Chemical Safety
Facility: 2038253 Tank: 1
Click for Facility/Tank Ownership history
Capacity:
10000
Product:
Diesel Fuel
Status:
Currently in use
Regulated Status
Federal
OSFM
First Notify Date:
8/10/1999
Current Age:
25
Install Date:
4/28/1999
Last Used Date:
Product Date:
Petroleum Use:
CERCLA Substance:
CAS Code:
Removed Date:
Abandoned Material:
Abandoned Date:
Red Tag Issue Date:
Fee Due:
$0.00
UL Number
Equipment Information
Equipment Type
Equipment
Install Date
Last Passing Test Date
Test Expire Date
Failed Test Date
Corrosion Prot - Piping
Fiberglass Non-Corrosive
N/A
N/A
Corrosion Prot - Tank
Fiberglass Non-Corrosive
2/18/1999
N/A
N/A
Leak Detect - Piping
Electronic Pressurized Line Leak Detection
2/18/1999
3/26/2024
3/26/2025
Leak Detect - Tank
Automatic Tank Gauging Veeder Root TLS 350 with CSLD
3/9/2022
3/26/2024
3/26/2025
Overfill Prev Device
Overfill Drop Tube Valve
6/6/2023
6/12/2023
6/12/2026
Piping
Fiberglass Double Wall Ameron Dualoy 3000/LCX
3/30/2023
N/A
N/A
Piping
Single Wall STP/Tanktop Sump
3/22/2023
3/22/2023
3/22/2026
Leak Detect - Piping
Sump Sensor with positive shutdown
3/26/2024
3/26/2025
Spill Contain Device
Single Wall Spill Bucket
2/18/1999
3/26/2024
3/26/2027
Tank
Fiberglass Single Wall Containment Solutions
2/18/1999
N/A
N/A
Latest Blended Fuel Compatibility Form
No Compatibility Forms Listed
Additional Tests
Equipment Type
Equipment
Test Type
Test Result
Test Date
History
Piping
Fiberglass Double Wall Ameron Dualoy 3000/LCX
Precision Test
Pass
3/26/2024
Show History
Piping
Fiberglass Single Wall Piping A.O. Smith
Precision Test
Pass
3/9/2022
Show History
Previous Page