Information
JB Pritzker, Governor
James A. Rivera, State Fire Marshal
Division of Petroleum & Chemical Safety
State of Illinois
Employment Opportunities
Ready Illinois
Find us on Facebook
UST
Search
Contractor Search
Permit Search
Disclaimer & Rules/Statutes
Disclaimer
Rules
Statutes
Statistics & Reports
Statistics
Red Tag Tanks
Blended Fuel Tanks
Federal Energy Act Reports
Help
Division of Petroleum & Chemical Safety
Facility: 3039284 Tank: 2
Click for Facility/Tank Ownership history
Capacity:
15000
Product:
Gasoline - Premium
Status:
Currently in use
Regulated Status
Federal
OSFM
First Notify Date:
6/5/2000
Current Age:
24
Install Date:
11/18/1999
Last Used Date:
Product Date:
11/18/1999
Petroleum Use:
CERCLA Substance:
CAS Code:
Removed Date:
Abandoned Material:
Abandoned Date:
Red Tag Issue Date:
Fee Due:
$0.00
UL Number
Equipment Information
Equipment Type
Equipment
Install Date
Last Passing Test Date
Test Expire Date
Failed Test Date
Corrosion Prot - Piping
Flexible Non-Corrosive
3/16/2009
N/A
N/A
Corrosion Prot - Tank
Fiberglass Non-Corrosive
3/16/2009
N/A
N/A
Leak Detect - Piping
Electronic Pressurized Line Leak Detection
2/29/2024
2/28/2025
Leak Detect - Tank
Automatic Tank Gauging Veeder Root TLS 350 Plus with CSLD
2/29/2024
2/28/2025
Leak Detect - Tank
Non-Discriminating Interstitial Monitoring Sensors
2/29/2024
2/28/2025
Overfill Prev Device
Overfill Drop Tube Valve
2/29/2024
2/28/2027
Piping
Polyethylene Chase
N/A
N/A
Piping
Flexible Double Wall OPW Flexworks
N/A
N/A
Piping
Single Wall STP/Tanktop Sump
2/29/2024
2/28/2027
Leak Detect - Piping
Sump Sensor with positive shutdown
2/29/2024
2/28/2025
Spill Contain Device
Double Wall Spill Bucket
2/29/2024
2/28/2027
Tank
Fiberglass Double Wall
3/16/2009
N/A
N/A
Latest Blended Fuel Compatibility Form
No Compatibility Forms Listed
Additional Tests
Equipment Type
Equipment
Test Type
Test Result
Test Date
History
Piping
Flexible Double Wall OPW Flexworks
Precision Test
Pass
2/29/2024
Show History
Piping
Flexible Double Wall Total Containment Enviroflex non-corrosive
Precision Test
Pass
9/26/2023
Show History
Tank
Fiberglass Double Wall
Precision Test (Tank)
Pass
2/29/2024
Show History
Leak Detect - Tank
Non-Discriminating Interstitial Monitoring Sensors
Sensor Functional
Pass
10/21/2006
Show History
Previous Page