Division of Petroleum & Chemical Safety

 

Facility: 2007521 Tank: 14

Click for Facility/Tank Ownership history

Capacity: 12000
Product: Gasoline - Regular
Status: Currently in use
Regulated Status Federal
OSFM First Notify Date: 11/13/1998
Current Age: 25
Install Date: 9/18/1998
Last Used Date:
Product Date: 9/19/1998
Petroleum Use:
CERCLA Substance:
CAS Code:
Removed Date:
Abandoned Material:
Abandoned Date:
Red Tag Issue Date:
Fee Due: $0.00
UL Number

Equipment Information

Equipment Type Equipment Install Date Last Passing Test Date Test Expire Date Failed Test Date
Corrosion Prot - Piping Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Piping Flexible Non-Corrosive N/A N/A
Corrosion Prot - Tank Fiberglass Non-Corrosive N/A N/A
Leak Detect - Piping Electronic Pressurized Line Leak Detection 1/16/2024 1/16/2025
Leak Detect - Tank Hydrostatic Reservoir Interstitial Monitoring Sensors with monitor 1/16/2024 1/16/2025
Overfill Prev Device Overfill Alarm 3/10/2021 3/10/2024
Overfill Prev Device Overfill Drop Tube Valve 3/19/2021 1/16/2024 1/16/2024
Piping Fiberglass Double Wall A.O. Smith N/A N/A
Piping Flexible Double Wall OPW Flexworks N/A N/A
Piping Single Wall STP/Tanktop Sump 6/7/2022 6/7/2025
Leak Detect - Piping Sump Sensor 2/9/2023 1/16/2024 1/16/2024
Piping Single Wall Transition Sump 6/7/2022 6/7/2025
Leak Detect - Piping Sump Sensor 2/9/2023 1/16/2024 1/16/2024
Spill Contain Device Double Wall Spill Bucket 11/11/2021 2/9/2023 2/9/2026
Tank Fiberglass Double Wall Owens Corning Brine Filled N/A N/A

Latest Blended Fuel Compatibility Form

No Compatibility Forms Listed


Additional Tests

Equipment Type Equipment Test Type Test Result Test Date History
Piping Fiberglass Double Wall A.O. Smith Precision Test Pass 2/9/2023 Show History
Piping Flexible Double Wall OPW Flexworks Precision Test Pass 3/3/2021 Show History