Division of Petroleum & Chemical Safety

 

Facility: 2017222 Tank: 5

Click for Facility/Tank Ownership history

Capacity: 6000
Product: E85
Status: Currently in use
Regulated Status Federal
OSFM First Notify Date: 12/11/1998
Current Age: 31
Install Date: 2/26/1993
Last Used Date:
Product Date: 2/26/1993
Petroleum Use:
CERCLA Substance:
CAS Code:
Removed Date:
Abandoned Material:
Abandoned Date:
Red Tag Issue Date:
Fee Due: $0.00
UL Number

Equipment Information

Equipment Type Equipment Install Date Last Passing Test Date Test Expire Date Failed Test Date
Corrosion Prot - Piping Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Tank Lining Materials Internal Armor Shield TL 300M 1/13/2021 1/13/2026
Leak Detect - Piping Electronic Pressurized Line Leak Detection 2/9/2024 2/9/2025
Leak Detect - Tank Automatic Tank Gauging Veeder Root TLS 350 with CSLD 2/9/2024 2/9/2025
Overfill Prev Device Overfill Drop Tube Valve 1/16/2023 1/16/2023 1/16/2026
Piping Fiberglass Single Wall Piping Ameron Dualoy 3000/L 1/16/2023 N/A N/A
Piping Single Wall STP/Tanktop Sump 1/13/2023 1/13/2023 1/13/2026
Spill Contain Device Single Wall Spill Bucket 5/21/2020 1/13/2023 1/13/2026
Tank Steel Single Wall N/A N/A

Latest Blended Fuel Compatibility Form

File Name Status Status Date
CompatibilityFormSummary01172023-074653.pdf Approved 1/17/2023

Compatibility Form Attachments

File Name Description
veeder root probes.pdf ATG Probe
wayne dispensers all.pdf Dispenser #1/2
veeder root plld.pdf Electronic Pressurized Line Leak Detection
ameron fiberglass pipe.pdf Fiberglass Single Wall Piping
APT Sumps E85 Compatibility Letter 08.07.19.pdf Franklin Fueling
FFS-0392 Defender Series OPV Datasheet.pdf Overfill Drop Tube Valve
APT Sumps E85 Compatibility Letter 08.07.19.pdf Single Wall Dispenser Sump
Opw spill containers.pdf Single Wall Spill Bucket
bridgeport tank lining.pdf Steel Single Wall
franklin stp.pdf Submersible Pump
veeder root probes.pdf Veeder Root TLS 350

Additional Tests

Equipment Type Equipment Test Type Test Result Test Date History
Piping Fiberglass Single Wall Piping Precision Test Pass 3/14/2022 Show History
Piping Fiberglass Single Wall Piping Ameron Dualoy 3000/L Precision Test Pass 2/9/2024 Show History